Skip Navigation Linksweather.gov  
NOAA logo - Click to go to the NOAA homepage National Weather Service   NWS logo - Click to go to the NWS homepage
Internatinal Activities Office - Improving the level of science, technology, operations, and services... world wide
 
 
Local forecast by
"City, St"
Summary of Projects page

Date: JANUARY 8, 2007


Current Projects:

Past |

Project: Saudi Project Funding: Saudi Arabia Amount: $1.1M
Description: Technical meteorological and environmental protection partnership often spawns rewards with significant social, economical benefits, (i.e., more accurate weather forecasts, cleaner water, better hazardous waste management, etc). Other benefits: increased data flow from Middle East (Saudi and 22 other Arab speaking nations), which correlates to more accurate global numerical weather prediction models; improved relations (Foreign Policy); more accurate and timely forecasts in Saudi Arabia to protect the estimated 18 million people.
Status:

Implemented Acquisition Plan.

Output: Technology Transfer, Training, and Technical Assistance
Start Date: March, 2001
End Date: September, 2011

Project: Third Border Initiative Funding: DOS/USAID Amount: $452,000
Description: (1) Enhance, renovate, and rehabilitate the hydrometeorological monitoring network in the CARICOM region, including upper-air and surface observation systems as well as sea-level monitoring networks; (2) Deploy the Emergency Manager's Weather Information Network (EMWIN) as a satellite-based natural-hazard information network.
Status:

In progress; one-year funding only (FY07)

Output: Technical assistance and training
Start Date: July, 2006
End Date: September, 2007

Project: Indian Ocean Funding: USAID Amount: $4.6M
Description: Develop Indian Ocean Tsunami Warning System
Status:

Implementing NOAA IOTWS plan

More Information

Output: Regional Observation System Design completed. Currently Implementing Plan to establish IOTWS with the UNESCO, IOC, AND WMO
Start Date: October, 2005
End Date: October, 2007

Project: Mexico Funding: Mexico Amount: $365k
Description: Modernize Mexico's hydrologic forecasting capability
Status: Training and technical assistance
Output: Transfer National Weather Service River Forecast System technology to regional hydrologic forecast centers
Start Date: 1996
End Date: Continuing

Project: Asia Flood Network Funding: USAID Amount: $1000k
Description: NWS is cooperating with the US Geological and other US hydrometeorological organizations to transfer flood-related technologies to Asia, and train counterpart organizations in their use. More Info
Status: Concurrent training and capacity building activities via regional organizations in Southeast Asia and South Asia.
Output:

Reduced loss of life and property via improved flood forecasting and warning information to flood-at-risk communities in Asia.

Start Date: 2003
End Date: 2008

Project: Czech Republic Funding: NWS Amount: $20k
Description: Improve flood forecast capabilities
Status: In 2006, four government representatives from Czech Republic visited the NWS toward a goal of developing a flash flood monitoring and warning program within the Czech Republic.  A NWS official visited Prague to present lectures on short-range rainfall prediction and an evolving system for creating flash flood guidance from digital elevation model and land-surface data.
Output: Assist with developing flash flood forecasting and warning program
Start Date: 2000
End Date: 2007

Project: Romania DESWAT Funding: Romania Amount: $750k
Description: Destructive Water Abatement and Control of Water Disasters (DESWAT)
Status:

Implementation of NWS’s River Forecast System (RFS) technology and to assist Romania’s Ministry of Water and Environmental Protection of Romania (MoWEP) undertake flood-forecasting, in conjunction with Lockheed Martin. The project has three components:

  1. Collect information to allow NWS to become more familiar with Romania’s existing flood-forecasting system and identify characteristics of the meteorological modernization that can facilitate flood forecasting. (complete)
  2. Implement NWS River Forecast System technology concurrently at two levels, regional and nationally.
  3. Propose a national implementation of RFS technology nationwide.
Output:

Forecasting operation managed by Apele Romane (AR), the National Institute of Hydrology and Water Management (INHGA).

Start Date: 2000
End Date: 2008

Project: India Funding: USAID/New Delhi Amount: $973k
Description: Assist with improving forecasting for tropical cyclones, severe weather, extreme temperatures, floods and flash floods and with improving forecast communications
Status: Training completed at NOAA for 19 Indian scientists and engineers in all areas of the program; workshop on HWRF cyclone model scheduled for January 2007 in New Delhi; training will continue through August 2007
Output: Training and technical assistance
Start Date: November, 2003
End Date: September, 2007

Past Projects:

Current |

Project: PC ETA Funding: VCP Amount: $273k
Description: Desktop Numerical Weather Prediction Modeling (ETA)
Output: Four pilot project installations in Vietnam, Senegal, El Salvador, and Peru.
Start Date: January, 2005
End Date: September, 2006

Project: CaribHR Funding: FY04 Supplemental Amount: $325k
Description: Caribbean Hurricane Reconstruction & emergency protocol
Output: Installed replacement/upgrade hardware and software in Honduras, Jamaica, Grenada, Bahamas, and Cayman Islands; Meeting in Miami, February 2006, to discuss protocol, TBI, and Hurricane reconstruction status.
Start Date: December, 2004
End Date: September, 2006

Project: Tunisia Workshop Funding: State Department Amount: $35k
Description: Weather Services Operations Workshop
Output: Five day workshop on operations of Weather Services
Start Date: January, 2005
End Date: February, 2005

Project: Central America Funding: USAID Amount: $75k
Description: Development of regional emergency management protocol for national hydrometeorological services in Central America and the Caribbean
Output: Coordinated emergency management protocol
Start Date: August, 2004
End Date: April, 2005

Project: SMOK Funding: Poland Amount: $220k
Description: Technical assistance in modernization of hydrometeorology services
Output: Modernized Hydrometeorological Services
Start Date: June, 2002
End Date: December, 2004

Project: Nile River Funding: USAID/Egypt Amount: $7M
Description: Develop and implement River Forecast System for High Aswan Dam
Output: Operational River Forecast System for Nile River
Start Date: 1992
End Date: 2001

Project: Panama Canal Funding: Panama Canal Commission Amount: $850k
Description: Implement River and Flood Forecasting System for the Panama Canal
Output: Operational river and flood forecasting system (NWSRFS)
Start Date: 1993
End Date: 1994

Project: Hurricane Reconstruction Program Funding: USAID Amount: $8M
Description: Strengthen meteorological and hydrologic service and implement early warning capabilities
Output: Upgraded HYDROMET forecasting, monitoring, and early warning capabilities
Start Date: June, 1999
End Date: September, 2002

Project: Aral Sea Funding: USAID/Central Asia Amount: $450k
Description: NWSRFS Snowmelt Forecasting for Syr Dayra
Output: Operational River Forecast System (NWSRFS)
Start Date: 2001
End Date: 2002

Project: After MITCH Funding: USAID/GCAP Amount: $160k
Description: Support Regional Rio Lempa National Weather Service River Forecast System
Output: Advanced Training and technical assistance for the NWSRFS
Start Date: 2003
End Date: 2004

Project: El Salvador Funding: USAID/El Salvador Amount: $145k
Description: Support hydrologic forecasting operations and flash flood warnings
Output: Upgraded hydrologic forecast capabilities
Start Date: 2003
End Date: 2004

Project: Vietnam Funding: NWS Amount: $20k
Description: Deploy National Weather Service River Forecast System in Red River Basin in Vietnam
Output: NWSRFS implemented for Red River
Start Date: October, 2003
End Date: January, 2004

Project: CAMI Funding: USAID/Central America Amount: $875k
Description: Implement National Weather Service River Forecast System and a regional Flash Flood Guidance System in Nicaragua
Output: Operational Flash Flood Guidance System for Central America and NWSRFS on Rio Estero Real in Nicaragua
Start Date: July, 2001
End Date: July, 2004

Go back to Current | Past | 

Last Update: July 17, 2008



Back  Top

Home, Mission Statement, Staff, International Agreements, WMO,
International Projects, Training and Support

If you require our PowerPoint presentations/PDF documents in a more accessible format, please .


NOAA, NWS, W/IA
International Activities Office
1325 East-West Highway
Silver Spring, MD 20910
Page Author:
Page last modified: 14-Apr-2009 5:03 PM

Disclaimer
Information Quality
Credits
Glossary

Privacy Policy
Freedom of Information Act (FOIA)
About Us
Career Opportunities