Downstream Targets based on phase of Lake
Downstream Targets based on phase of Lake
Phase I – 60-80 percent full channel
Phase III – Roughly 120 %
Cause some encroachments and low lying farm land
If water gets above the flood control pool the lake operation goals change
Protect the structure of the dam rather than downstream flooding