Home > Products > Valid Products > RVA

000
SRUS43 KGRB 011430
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-021430-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
830 AM CST SUN MAR 1 2015

...Menominee-Oconto-Peshtigo basins...
                                       This
                      Flood Bankfull   Mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Iron River...
Caspian-mi              11     10      4.72    0.09     0.01
...Paint River...
Alpha-mi                 M      M      4.02    0.01     0.02
...Michigamme River...
Crystal Falls-MI         8      7
...Brule River...
Florence Hwy 41 USGS     9      6      5.16    0.02     0.01
Commonwealth 3N USGS    12     10      6.69   -0.12     0.00
...Popple River...
Fence 3NW       USGS     6      4      2.41    0.02     0.05
...Pine River...
Florence 6S     USGS     7      6      3.41    0.05     0.07
...Menominee River...
Florence-4NE    USGS     9    8.5      4.11   -1.19    -1.19
Twin Falls      USGS  18.5   20.5     15.69   -0.01     0.04
Niagara         USGS    13     10      5.88   -0.07    -0.09
Vulcan          USGS    16     14      6.04   -0.02    -0.08
Pembine 11SE    USGS    15     12     11.92    0.01    -0.07
Banat           USGS    14     11      7.32   -0.08    -0.21
Koss,MI         USGS    17     15     11.03   -0.02     0.05
McAllister 3E   USGS    15     12     10.76   -0.05    -0.08
...Pike River...
Amberg          USGS   6.5    4.5      3.35    0.03     0.02
...Oconto River...
Gillett         USGS   7.5    5.5
Stiles  Oconto Elect   605    603
Oconto 5SW      USGS     9      7      5.24   -0.26     2.00
...Peshtigo River...
Athelstane      USGS     9    6.5      4.84    0.01     0.00
Porterfield     USGS    12     10      8.64    0.01     0.00
Peshtigo        USGS    10      9      2.52    0.05     0.01
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wolf River...

Shawano          NWS     11     10     8.43   -0.02    -0.12
Shiocton        WWTP     11      9     4.20    0.00     0.02
New London     USACE      9      7     2.85   -0.01    -0.01
...Red River...
Gresham 4NW     USGS     11      9     6.28    0.01    -0.08
...Embarrass River...
Embarrass 4NW   USGS      7      6
...Little Wolf River...
Royalton       USACE      5      4     1.97    0.00    -0.03
...Waupaca River...
Waupaca 5SE    USACE      6      5     2.48    0.02     0.02
...Fox River...
Oshkosh         USGS    7.5      7     4.96    0.02     0.02
Appleton        USGS    8.4    7.5     5.38    0.02     0.03
Green Bay       USGS    584    582   579.39   -0.02     0.14
...Lake Winnebago...
Oshkosh        USACE    3.5    3.3     1.72    0.01     0.01
Stockbridge    USACE     m     m       1.64    0.00     0.01
Menasha        USACE    5.5      5     1.66    0.00     0.01
...Duck Creek...
Howard/Hobart   USGS     18     15    11.41    0.03    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Lake Michigan rivers
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Kewaunee River...
Kewaunee        USGS     14     12     9.50   -0.01    -0.01
...Manitowoc River...
Manitowoc       USGS     10      8     3.82    0.08     0.05
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wisconsin River...
Lac Vieux Desert USGS    82.5   81
Lake Tomahawk    USGS     6      4     2.09   -0.01     0.00
Merrill          USGS    11     10     5.17    0.25     0.26
Rothschild       USGS    25     18    13.53   -0.36    -0.29
Wisconsin Rapids  CWP    12     10     2.82    0.00    -0.18
...Spirit River...
Spirit Falls     USGS     8      5
...Prairie River...
Merrill   Hwy C  USGS     7    4.5     2.17    0.05     0.07
...Big Rib River...
Rib Falls        USGS    10      7     2.58   -0.04    -0.09
...Eau Claire River...
Kelly            USGS     9      7
...Big Eau Pleine River...
Stratford        USGS  15.5     11     3.27    1.64     1.65
...Plover River...
Stevens Point    USGS   7.5      6     1.11    0.72     0.74
...Ten Mile Creek...
Nekoosa          USGS   9.5    7.5     4.48   -0.45    -0.57
...Yellow River...
Pittsville       WWTP    13     10
Babcock          USGS    12     10     2.49    0.01     0.04
$$
----------------------------
     ...Frost depth and snow core sample data...
Updated on this summary during the winter months.
Frost depth measurements are normally taken on Monday
and Thursday mornings.  Snow core samples are taken if
Snow depth is 2 inches or more.
                                      Top of       Snow
                             Frost  Frost layer    Core
                             depth    thawed      Sample
Location            County    (in)     (in)        (in)
Presque Isle        Vilas       M        M           M
Land O Lakes 10w    Vilas       M        M           M
Phelps              Vilas       M        M           M
Boulder Junction 2N Vilas       M        M           M
Arbor Vitae-Jnsn Lk Vilas       M        M           M
Long Lake 3NE       Florence    M        M           M
Aurora 4W           Florence   28        0           M
Florence Utility    Florence   58        0           M
Mole Lake           Forest      M        M           M
Lake Tomahawk 2SE   Oneida      M        M        2.80
Merrill 4W          Lincoln     M        M        2.00
Merrill 8W          Lincoln     M        M           M
Althestane          Marinette  35        0           M
Marinette WPS       Marinette   M        M           M
Townsend 2NE        Oconto      M        M           M
Oconto-1NW Hwy Dept Oconto     32        0           M
Suring-4E Hwy Dept  Oconto     42        M           M
Antigo DNR          Langlade    M        M           M
Wausau-TV-7         Marathon   29        0           M
Colby-5NE           Marathon    M        M           M
Keshena Forestry    Menominee  20        0           M
Marshfield uw       Wood       16        0           M
Plover-south        Portage    31        0        0.20
Stevens Point S     Portage     M        M           M
Almond 5NE          Portage    34        0        1.70
Hancock UW Farm     Waushara    M        M           M
Clintonville WWTP   Waupaca     M        M        0.70
Weyauwega           Waupaca    46        0        0.40
Bowler              Shawano    37        0           M
Appleton-East-DOT   Outagamie  28        0           M
Kimberly            Outagamie   M        M           M
Appleton east       Outagamie  28        0           M
Darboy Appleton 4SE Outagamie  25        0           M
Oshkosh WWTP        Winnebago   M        M           M
Oshkosh north       Winnebago   M        M           M
Oshkosh-4N Hwy Dept Winnebago  25        0           M
Suamico 3SW            Brown   37        0           M
Green Bay NWS          Brown   27        0        0.90
Green Bay-4NW Hwy Dept Brown    M        M           M
Greenleaf Hwy Dept     Brown    M        M           M
Chilton Wwtp        Calumet    20        M           M
Kiel                Manitowoc   M        M
Manitowoc south     Manitowoc   8        0           M
Manitowoc-Rockwood  Manitowoc   8        0           M
Kewaunee-3W hwy Dept Kewaunee   M        M           M
Casco-2W Hwy Dept    Kewaunee  18        0           M
Ephraim-1NE  WWTP        Door   M        M           M
Sister Bay-1S Hwy dept   Door  34        0           M
Sturgeon Bay-1S Hwy Dept Door  31        0           M
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season.  Most data
in this report is from the U.S. Geological Survey.  Other sources
include U.S Army Corps of Engineers and Wisconsin Public Service.
Snowfall and frost depth reported from various observers.
$$






000
SRUS43 KGRB 011430
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-021430-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
830 AM CST SUN MAR 1 2015

...Menominee-Oconto-Peshtigo basins...
                                       This
                      Flood Bankfull   Mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Iron River...
Caspian-mi              11     10      4.72    0.09     0.01
...Paint River...
Alpha-mi                 M      M      4.02    0.01     0.02
...Michigamme River...
Crystal Falls-MI         8      7
...Brule River...
Florence Hwy 41 USGS     9      6      5.16    0.02     0.01
Commonwealth 3N USGS    12     10      6.69   -0.12     0.00
...Popple River...
Fence 3NW       USGS     6      4      2.41    0.02     0.05
...Pine River...
Florence 6S     USGS     7      6      3.41    0.05     0.07
...Menominee River...
Florence-4NE    USGS     9    8.5      4.11   -1.19    -1.19
Twin Falls      USGS  18.5   20.5     15.69   -0.01     0.04
Niagara         USGS    13     10      5.88   -0.07    -0.09
Vulcan          USGS    16     14      6.04   -0.02    -0.08
Pembine 11SE    USGS    15     12     11.92    0.01    -0.07
Banat           USGS    14     11      7.32   -0.08    -0.21
Koss,MI         USGS    17     15     11.03   -0.02     0.05
McAllister 3E   USGS    15     12     10.76   -0.05    -0.08
...Pike River...
Amberg          USGS   6.5    4.5      3.35    0.03     0.02
...Oconto River...
Gillett         USGS   7.5    5.5
Stiles  Oconto Elect   605    603
Oconto 5SW      USGS     9      7      5.24   -0.26     2.00
...Peshtigo River...
Athelstane      USGS     9    6.5      4.84    0.01     0.00
Porterfield     USGS    12     10      8.64    0.01     0.00
Peshtigo        USGS    10      9      2.52    0.05     0.01
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wolf River...

Shawano          NWS     11     10     8.43   -0.02    -0.12
Shiocton        WWTP     11      9     4.20    0.00     0.02
New London     USACE      9      7     2.85   -0.01    -0.01
...Red River...
Gresham 4NW     USGS     11      9     6.28    0.01    -0.08
...Embarrass River...
Embarrass 4NW   USGS      7      6
...Little Wolf River...
Royalton       USACE      5      4     1.97    0.00    -0.03
...Waupaca River...
Waupaca 5SE    USACE      6      5     2.48    0.02     0.02
...Fox River...
Oshkosh         USGS    7.5      7     4.96    0.02     0.02
Appleton        USGS    8.4    7.5     5.38    0.02     0.03
Green Bay       USGS    584    582   579.39   -0.02     0.14
...Lake Winnebago...
Oshkosh        USACE    3.5    3.3     1.72    0.01     0.01
Stockbridge    USACE     m     m       1.64    0.00     0.01
Menasha        USACE    5.5      5     1.66    0.00     0.01
...Duck Creek...
Howard/Hobart   USGS     18     15    11.41    0.03    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Lake Michigan rivers
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Kewaunee River...
Kewaunee        USGS     14     12     9.50   -0.01    -0.01
...Manitowoc River...
Manitowoc       USGS     10      8     3.82    0.08     0.05
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wisconsin River...
Lac Vieux Desert USGS    82.5   81
Lake Tomahawk    USGS     6      4     2.09   -0.01     0.00
Merrill          USGS    11     10     5.17    0.25     0.26
Rothschild       USGS    25     18    13.53   -0.36    -0.29
Wisconsin Rapids  CWP    12     10     2.82    0.00    -0.18
...Spirit River...
Spirit Falls     USGS     8      5
...Prairie River...
Merrill   Hwy C  USGS     7    4.5     2.17    0.05     0.07
...Big Rib River...
Rib Falls        USGS    10      7     2.58   -0.04    -0.09
...Eau Claire River...
Kelly            USGS     9      7
...Big Eau Pleine River...
Stratford        USGS  15.5     11     3.27    1.64     1.65
...Plover River...
Stevens Point    USGS   7.5      6     1.11    0.72     0.74
...Ten Mile Creek...
Nekoosa          USGS   9.5    7.5     4.48   -0.45    -0.57
...Yellow River...
Pittsville       WWTP    13     10
Babcock          USGS    12     10     2.49    0.01     0.04
$$
----------------------------
     ...Frost depth and snow core sample data...
Updated on this summary during the winter months.
Frost depth measurements are normally taken on Monday
and Thursday mornings.  Snow core samples are taken if
Snow depth is 2 inches or more.
                                      Top of       Snow
                             Frost  Frost layer    Core
                             depth    thawed      Sample
Location            County    (in)     (in)        (in)
Presque Isle        Vilas       M        M           M
Land O Lakes 10w    Vilas       M        M           M
Phelps              Vilas       M        M           M
Boulder Junction 2N Vilas       M        M           M
Arbor Vitae-Jnsn Lk Vilas       M        M           M
Long Lake 3NE       Florence    M        M           M
Aurora 4W           Florence   28        0           M
Florence Utility    Florence   58        0           M
Mole Lake           Forest      M        M           M
Lake Tomahawk 2SE   Oneida      M        M        2.80
Merrill 4W          Lincoln     M        M        2.00
Merrill 8W          Lincoln     M        M           M
Althestane          Marinette  35        0           M
Marinette WPS       Marinette   M        M           M
Townsend 2NE        Oconto      M        M           M
Oconto-1NW Hwy Dept Oconto     32        0           M
Suring-4E Hwy Dept  Oconto     42        M           M
Antigo DNR          Langlade    M        M           M
Wausau-TV-7         Marathon   29        0           M
Colby-5NE           Marathon    M        M           M
Keshena Forestry    Menominee  20        0           M
Marshfield uw       Wood       16        0           M
Plover-south        Portage    31        0        0.20
Stevens Point S     Portage     M        M           M
Almond 5NE          Portage    34        0        1.70
Hancock UW Farm     Waushara    M        M           M
Clintonville WWTP   Waupaca     M        M        0.70
Weyauwega           Waupaca    46        0        0.40
Bowler              Shawano    37        0           M
Appleton-East-DOT   Outagamie  28        0           M
Kimberly            Outagamie   M        M           M
Appleton east       Outagamie  28        0           M
Darboy Appleton 4SE Outagamie  25        0           M
Oshkosh WWTP        Winnebago   M        M           M
Oshkosh north       Winnebago   M        M           M
Oshkosh-4N Hwy Dept Winnebago  25        0           M
Suamico 3SW            Brown   37        0           M
Green Bay NWS          Brown   27        0        0.90
Green Bay-4NW Hwy Dept Brown    M        M           M
Greenleaf Hwy Dept     Brown    M        M           M
Chilton Wwtp        Calumet    20        M           M
Kiel                Manitowoc   M        M
Manitowoc south     Manitowoc   8        0           M
Manitowoc-Rockwood  Manitowoc   8        0           M
Kewaunee-3W hwy Dept Kewaunee   M        M           M
Casco-2W Hwy Dept    Kewaunee  18        0           M
Ephraim-1NE  WWTP        Door   M        M           M
Sister Bay-1S Hwy dept   Door  34        0           M
Sturgeon Bay-1S Hwy Dept Door  31        0           M
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season.  Most data
in this report is from the U.S. Geological Survey.  Other sources
include U.S Army Corps of Engineers and Wisconsin Public Service.
Snowfall and frost depth reported from various observers.
$$





000
SRUS43 KGRB 010045
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-020045-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
645 PM CST SAT FEB 28 2015

...Menominee-Oconto-Peshtigo basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Iron River...
Caspian-MI             11     10      4.72    0.09     0.00
...Paint River...
Alpha-MI                m      m      4.02    0.01     0.01
...Michigamme River...
Crystal Falls-MI        8      7
...Brule River...
Florence Hwy 41         9      6      5.12   -0.02     0.04
Commonwealth 3N        12     10      6.78   -0.03     0.11
...Popple River...
Fence     3NW           6      4      2.40    0.01     0.01
...Pine River...
Florence 6S             7      6      3.39   -0.06    -0.21
...Menominee River...
Florence-4NE            9    8.5      3.96   -1.34     0.07
Twin Falls dam        20.5  18.5     15.49   -0.21    -0.15
Niagara                13     10      6.64    0.69    -0.02
Vulcan-MI              15      9      6.08    0.02     0.00
Pembine     11SE       15     12     11.96    0.05     0.09
Banat-White Rapids     14     11      7.27   -0.09     0.10
Koss-MI       1SE      17     15     11.02
McAllister 3E          15     12     10.71   -0.10    -0.03
...Pike River...
Amberg    Hwy 141     6.5    4.5      3.32    0.00     0.01
...Oconto River...
Gillett               7.5    5.5      3.42
Oconto 5SW              9      7      4.89   -0.59    -0.29
...Peshtigo River...
Athelstane 10WSW        9    6.5      4.79
Porterfield            12     10      8.66    0.03    -0.01
Peshtigo               10      9      2.53    0.09    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wolf River...
Langlade              11.5    9.5     9.30    0.03     0.03
Shawano 4N              11     10     8.38   -0.07    -0.09
Shiocton              once a day reading in the morning
New London               9      7     2.85   -0.01    -0.01
...Red River...
Gresham 4NW             11      9     6.22   -0.08    -0.08
...Embarrass River...
Embarrass 4NW*           7      6     3.55
...Little Wolf River...
Royalton                 5      4     1.98    0.01    -0.08
...Waupaca River...
Waupaca 5SE              6      5     2.48   -0.02    -0.02
...Fox River...
Oshkosh                7.5      7     4.95    0.01     0.01
Appleton                 9    7.5     5.38    0.02     0.02
Green Bay              584    582   579.30   -0.09     0.15
...Lake Winnebago...
Oshkosh                3.5    3.3     1.71    0.00     0.00
Stockbridge              m     m      1.64    0.00     0.00
Menasha-Fritse Park    5.5      5     1.65   -0.01
...Duck Creek...
Howard/Hobart           18     15    11.39    0.01    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Lake Michgan Rivers
                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Kewaunee River...
Kewaunee                14     12     9.47   -0.04     0.03
...Manitowoc River...
Manitowoc               10      8     5.08    1.34     0.14
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wisconsin River...
Lake Tomahawk-Rnbow      6      4     2.10    0.00     0.00
Merrill                 11     10     4.82   -0.10    -0.27
Rothschild              25     18    14.07    0.18     0.18
Wisconsin Rapids        12     10     2.82
...Spirit River...
Spirit Falls             8      5     1.54   -0.01    -0.02
...Prairie River...
Merrill*      hwy c      7    4.5     2.29    0.17    -0.03
...Big Rib River...
Rib Falls               10      7     2.60   -0.02    -0.03
...Eau Claire River...
Kelly-Rothschild         7      6     5.60
...Big Eau Pleine River...
Stratford*            15.5     11     3.24    1.61    -0.02
...Plover River...
Stevens Point          7.5      6     1.40    1.01     0.21
...Ten Mile Creek...
Nekoosa                9.5    7.5     4.62
...Yellow River...
Babcock                 12     10     2.48    0.00     0.02
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season. Most data
in this report is from the U.S. Geological Survey. Other sources
include U.S Army Corps of Engineers, Wisconsin Public Service
and some partners with NWS Marquette.
$$






000
SRUS43 KGRB 281430
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-011430-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
830 AM CST SAT FEB 28 2015

...Menominee-Oconto-Peshtigo basins...
                                       This
                      Flood Bankfull   Mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Iron River...
Caspian-mi              11     10      4.63   -0.08    -0.06
...Paint River...
Alpha-mi                 M      M      4.01    0.01     0.02
...Michigamme River...
Crystal Falls-MI         8      7
...Brule River...
Florence Hwy 41 USGS     9      6      5.14   -0.01    -0.01
Commonwealth 3N USGS    12     10      6.81    0.12     0.06
...Popple River...
Fence 3NW       USGS     6      4      2.39    0.03     0.06
...Pine River...
Florence 6S     USGS     7      6      3.36    0.02    -0.04
...Menominee River...
Florence-4NE    USGS     9    8.5      5.30    0.50     0.50
Twin Falls      USGS  18.5   20.5     15.70    0.05    -0.12
Niagara         USGS    13     10      5.95   -0.02    -0.72
Vulcan          USGS    16     14      6.06   -0.06    -0.08
Pembine 11SE    USGS    15     12     11.91   -0.08    -0.12
Banat           USGS    14     11      7.40   -0.13    -0.03
Koss,MI         USGS    17     15     11.05    0.07    -0.05
McAllister 3E   USGS    15     12     10.81   -0.03    -0.04
...Pike River...
Amberg          USGS   6.5    4.5      3.32   -0.01    -0.06
...Oconto River...
Gillett         USGS   7.5    5.5
Stiles  Oconto Elect   605    603
Oconto 5SW      USGS     9      7      5.50    2.26     0.19
...Peshtigo River...
Athelstane      USGS     9    6.5      4.83   -0.01    -0.04
Porterfield     USGS    12     10      8.63   -0.01    -0.03
Peshtigo        USGS    10      9      2.47   -0.04     0.00
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wolf River...

Shawano          NWS     11     10     8.45   -0.10     0.09
Shiocton        WWTP     11      9     4.20    0.02     0.00
New London     USACE      9      7     2.86    0.00    -0.01
...Red River...
Gresham 4NW     USGS     11      9     6.27   -0.09    -0.13
...Embarrass River...
Embarrass 4NW   USGS      7      6
...Little Wolf River...
Royalton       USACE      5      4     1.97   -0.03    -0.05
...Waupaca River...
Waupaca 5SE    USACE      6      5     2.46    0.00    -0.02
...Fox River...
Oshkosh         USGS    7.5      7     4.94    0.00     0.00
Appleton        USGS    8.4    7.5     5.36    0.01     0.20
Green Bay       USGS    584    582   579.41    0.16     0.47
...Lake Winnebago...
Oshkosh        USACE    3.5    3.3     1.71    0.00     0.00
Stockbridge    USACE     m     m       1.64    0.01     0.01
Menasha        USACE    5.5      5     1.66    0.01     0.04
...Duck Creek...
Howard/Hobart   USGS     18     15    11.38   -0.04    -0.05
----------------------------------------------------------
----------------------------------------------------------
...Lake Michigan rivers
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Kewaunee River...
Kewaunee        USGS     14     12     9.51    0.00     0.01
...Manitowoc River...
Manitowoc       USGS     10      8     3.74   -0.03     0.05
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wisconsin River...
Lac Vieux Desert USGS    82.5   81
Lake Tomahawk    USGS     6      4     2.10    0.01     0.01
Merrill          USGS    11     10     4.92    0.01    -0.41
Rothschild       USGS    25     18    13.89    0.07    -0.52
Wisconsin Rapids  CWP    12     10     2.82   -0.18    -0.08
...Spirit River...
Spirit Falls     USGS     8      5
...Prairie River...
Merrill   Hwy C  USGS     7    4.5     2.12    0.02     0.01
...Big Rib River...
Rib Falls        USGS    10      7     2.62   -0.05    -0.05
...Eau Claire River...
Kelly            USGS     9      7
...Big Eau Pleine River...
Stratford        USGS  15.5     11     1.61   -0.01    -0.20
...Plover River...
Stevens Point    USGS   7.5      6     0.39    0.02    -0.34
...Ten Mile Creek...
Nekoosa          USGS   9.5    7.5     4.93   -0.12     0.54
...Yellow River...
Pittsville       WWTP    13     10
Babcock          USGS    12     10     2.48    0.03     0.04
$$
----------------------------
     ...Frost depth and snow core sample data...
Updated on this summary during the winter months.
Frost depth measurements are normally taken on Monday
and Thursday mornings.  Snow core samples are taken if
Snow depth is 2 inches or more.
                                      Top of       Snow
                             Frost  Frost layer    Core
                             depth    thawed      Sample
Location            County    (in)     (in)        (in)
Presque Isle        Vilas       M        M           M
Land O Lakes 10w    Vilas       M        M           M
Phelps              Vilas       M        M           M
Boulder Junction 2N Vilas       M        M           M
Arbor Vitae-Jnsn Lk Vilas       M        M           M
Long Lake 3NE       Florence    M        M           M
Aurora 4W           Florence   28        0           M
Florence Utility    Florence   58        0           M
Mole Lake           Forest      M        M           M
Lake Tomahawk 2SE   Oneida      M        M        2.80
Merrill 4W          Lincoln     M        M        2.00
Merrill 8W          Lincoln     M        M           M
Althestane          Marinette  34        0           M
Marinette WPS       Marinette   M        M           M
Townsend 2NE        Oconto      M        M           M
Oconto-1NW Hwy Dept Oconto     32        0           M
Suring-4E Hwy Dept  Oconto     42        M           M
Antigo DNR          Langlade    M        M           M
Wausau-TV-7         Marathon   29        0           M
Colby-5NE           Marathon    M        M           M
Keshena Forestry    Menominee  20        0           M
Marshfield uw       Wood       16        0           M
Plover-south        Portage    31        0        0.20
Stevens Point S     Portage     M        M           M
Almond 5NE          Portage    33        0        1.70
Hancock UW Farm     Waushara    M        M           M
Clintonville WWTP   Waupaca     M        M        0.70
Weyauwega           Waupaca    46        0        0.40
Bowler              Shawano    37        0           M
Appleton-East-DOT   Outagamie  28        0           M
Kimberly            Outagamie   M        M           M
Appleton east       Outagamie  28        0           M
Darboy Appleton 4SE Outagamie  25        0           M
Oshkosh WWTP        Winnebago   M        M           M
Oshkosh north       Winnebago   M        M           M
Oshkosh-4N Hwy Dept Winnebago  25        0           M
Suamico 3SW            Brown   37        0           M
Green Bay NWS          Brown   27        0        0.90
Green Bay-4NW Hwy Dept Brown    M        M           M
Greenleaf Hwy Dept     Brown    M        M           M
Chilton Wwtp        Calumet    20        M           M
Kiel                Manitowoc   M        M
Manitowoc south     Manitowoc   8        0           M
Manitowoc-Rockwood  Manitowoc   8        0           M
Kewaunee-3W hwy Dept Kewaunee   M        M           M
Casco-2W Hwy Dept    Kewaunee  18        0           M
Ephraim-1NE  WWTP        Door   M        M           M
Sister Bay-1S Hwy dept   Door  34        0           M
Sturgeon Bay-1S Hwy Dept Door  31        0           M
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season.  Most data
in this report is from the U.S. Geological Survey.  Other sources
include U.S Army Corps of Engineers and Wisconsin Public Service.
Snowfall and frost depth reported from various observers.
$$






000
SRUS43 KGRB 281430
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-011430-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
830 AM CST SAT FEB 28 2015

...Menominee-Oconto-Peshtigo basins...
                                       This
                      Flood Bankfull   Mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Iron River...
Caspian-mi              11     10      4.63   -0.08    -0.06
...Paint River...
Alpha-mi                 M      M      4.01    0.01     0.02
...Michigamme River...
Crystal Falls-MI         8      7
...Brule River...
Florence Hwy 41 USGS     9      6      5.14   -0.01    -0.01
Commonwealth 3N USGS    12     10      6.81    0.12     0.06
...Popple River...
Fence 3NW       USGS     6      4      2.39    0.03     0.06
...Pine River...
Florence 6S     USGS     7      6      3.36    0.02    -0.04
...Menominee River...
Florence-4NE    USGS     9    8.5      5.30    0.50     0.50
Twin Falls      USGS  18.5   20.5     15.70    0.05    -0.12
Niagara         USGS    13     10      5.95   -0.02    -0.72
Vulcan          USGS    16     14      6.06   -0.06    -0.08
Pembine 11SE    USGS    15     12     11.91   -0.08    -0.12
Banat           USGS    14     11      7.40   -0.13    -0.03
Koss,MI         USGS    17     15     11.05    0.07    -0.05
McAllister 3E   USGS    15     12     10.81   -0.03    -0.04
...Pike River...
Amberg          USGS   6.5    4.5      3.32   -0.01    -0.06
...Oconto River...
Gillett         USGS   7.5    5.5
Stiles  Oconto Elect   605    603
Oconto 5SW      USGS     9      7      5.50    2.26     0.19
...Peshtigo River...
Athelstane      USGS     9    6.5      4.83   -0.01    -0.04
Porterfield     USGS    12     10      8.63   -0.01    -0.03
Peshtigo        USGS    10      9      2.47   -0.04     0.00
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wolf River...

Shawano          NWS     11     10     8.45   -0.10     0.09
Shiocton        WWTP     11      9     4.20    0.02     0.00
New London     USACE      9      7     2.86    0.00    -0.01
...Red River...
Gresham 4NW     USGS     11      9     6.27   -0.09    -0.13
...Embarrass River...
Embarrass 4NW   USGS      7      6
...Little Wolf River...
Royalton       USACE      5      4     1.97   -0.03    -0.05
...Waupaca River...
Waupaca 5SE    USACE      6      5     2.46    0.00    -0.02
...Fox River...
Oshkosh         USGS    7.5      7     4.94    0.00     0.00
Appleton        USGS    8.4    7.5     5.36    0.01     0.20
Green Bay       USGS    584    582   579.41    0.16     0.47
...Lake Winnebago...
Oshkosh        USACE    3.5    3.3     1.71    0.00     0.00
Stockbridge    USACE     m     m       1.64    0.01     0.01
Menasha        USACE    5.5      5     1.66    0.01     0.04
...Duck Creek...
Howard/Hobart   USGS     18     15    11.38   -0.04    -0.05
----------------------------------------------------------
----------------------------------------------------------
...Lake Michigan rivers
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Kewaunee River...
Kewaunee        USGS     14     12     9.51    0.00     0.01
...Manitowoc River...
Manitowoc       USGS     10      8     3.74   -0.03     0.05
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wisconsin River...
Lac Vieux Desert USGS    82.5   81
Lake Tomahawk    USGS     6      4     2.10    0.01     0.01
Merrill          USGS    11     10     4.92    0.01    -0.41
Rothschild       USGS    25     18    13.89    0.07    -0.52
Wisconsin Rapids  CWP    12     10     2.82   -0.18    -0.08
...Spirit River...
Spirit Falls     USGS     8      5
...Prairie River...
Merrill   Hwy C  USGS     7    4.5     2.12    0.02     0.01
...Big Rib River...
Rib Falls        USGS    10      7     2.62   -0.05    -0.05
...Eau Claire River...
Kelly            USGS     9      7
...Big Eau Pleine River...
Stratford        USGS  15.5     11     1.61   -0.01    -0.20
...Plover River...
Stevens Point    USGS   7.5      6     0.39    0.02    -0.34
...Ten Mile Creek...
Nekoosa          USGS   9.5    7.5     4.93   -0.12     0.54
...Yellow River...
Pittsville       WWTP    13     10
Babcock          USGS    12     10     2.48    0.03     0.04
$$
----------------------------
     ...Frost depth and snow core sample data...
Updated on this summary during the winter months.
Frost depth measurements are normally taken on Monday
and Thursday mornings.  Snow core samples are taken if
Snow depth is 2 inches or more.
                                      Top of       Snow
                             Frost  Frost layer    Core
                             depth    thawed      Sample
Location            County    (in)     (in)        (in)
Presque Isle        Vilas       M        M           M
Land O Lakes 10w    Vilas       M        M           M
Phelps              Vilas       M        M           M
Boulder Junction 2N Vilas       M        M           M
Arbor Vitae-Jnsn Lk Vilas       M        M           M
Long Lake 3NE       Florence    M        M           M
Aurora 4W           Florence   28        0           M
Florence Utility    Florence   58        0           M
Mole Lake           Forest      M        M           M
Lake Tomahawk 2SE   Oneida      M        M        2.80
Merrill 4W          Lincoln     M        M        2.00
Merrill 8W          Lincoln     M        M           M
Althestane          Marinette  34        0           M
Marinette WPS       Marinette   M        M           M
Townsend 2NE        Oconto      M        M           M
Oconto-1NW Hwy Dept Oconto     32        0           M
Suring-4E Hwy Dept  Oconto     42        M           M
Antigo DNR          Langlade    M        M           M
Wausau-TV-7         Marathon   29        0           M
Colby-5NE           Marathon    M        M           M
Keshena Forestry    Menominee  20        0           M
Marshfield uw       Wood       16        0           M
Plover-south        Portage    31        0        0.20
Stevens Point S     Portage     M        M           M
Almond 5NE          Portage    33        0        1.70
Hancock UW Farm     Waushara    M        M           M
Clintonville WWTP   Waupaca     M        M        0.70
Weyauwega           Waupaca    46        0        0.40
Bowler              Shawano    37        0           M
Appleton-East-DOT   Outagamie  28        0           M
Kimberly            Outagamie   M        M           M
Appleton east       Outagamie  28        0           M
Darboy Appleton 4SE Outagamie  25        0           M
Oshkosh WWTP        Winnebago   M        M           M
Oshkosh north       Winnebago   M        M           M
Oshkosh-4N Hwy Dept Winnebago  25        0           M
Suamico 3SW            Brown   37        0           M
Green Bay NWS          Brown   27        0        0.90
Green Bay-4NW Hwy Dept Brown    M        M           M
Greenleaf Hwy Dept     Brown    M        M           M
Chilton Wwtp        Calumet    20        M           M
Kiel                Manitowoc   M        M
Manitowoc south     Manitowoc   8        0           M
Manitowoc-Rockwood  Manitowoc   8        0           M
Kewaunee-3W hwy Dept Kewaunee   M        M           M
Casco-2W Hwy Dept    Kewaunee  18        0           M
Ephraim-1NE  WWTP        Door   M        M           M
Sister Bay-1S Hwy dept   Door  34        0           M
Sturgeon Bay-1S Hwy Dept Door  31        0           M
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season.  Most data
in this report is from the U.S. Geological Survey.  Other sources
include U.S Army Corps of Engineers and Wisconsin Public Service.
Snowfall and frost depth reported from various observers.
$$





000
SRUS43 KGRB 280045
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-010045-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
645 PM CST FRI FEB 27 2015

...Menominee-Oconto-Peshtigo basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Iron River...
Caspian-MI             11     10      4.72    0.01     0.01
...Paint River...
Alpha-MI                m      m      4.01    0.01     0.02
...Michigamme River...
Crystal Falls-MI        8      7
...Brule River...
Florence Hwy 41         9      6      5.08   -0.07     0.02
Commonwealth 3N        12     10      6.67   -0.02    -0.09
...Popple River...
Fence     3NW           6      4      2.39    0.03     0.04
...Pine River...
Florence 6S             7      6      3.59    0.24     0.26
...Menominee River...
Florence-4NE            9    8.5      3.89   -0.91    -0.62
Twin Falls dam        20.5  18.5     15.44   -0.21    -0.15
Niagara                13     10      6.66    0.69     0.02
Vulcan-MI              15      9      6.08   -0.04    -0.02
Pembine     11SE       15     12     11.87   -0.12    -0.21
Banat-White Rapids     14     11      7.12   -0.44    -0.02
Koss-MI       1SE      17     15     11.06
McAllister 3E          15     12     10.75   -0.10    -0.04
...Pike River...
Amberg    Hwy 141     6.5    4.5      3.31   -0.02    -0.02
...Oconto River...
Gillett               7.5    5.5      3.42   -0.01    -0.03
Oconto 5SW              9      7      5.16    1.96    -0.03
...Peshtigo River...
Athelstane 10WSW        9    6.5      4.78
Porterfield            12     10      8.67    0.03    -0.01
Peshtigo               10      9      2.54    0.04    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wolf River...
Langlade              11.5    9.5     9.29    0.03     0.01
Shawano 4N              11     10     8.47   -0.08    -0.04
Shiocton              once a day reading in the morning
New London               9      7     2.86    0.00     0.00
...Red River...
Gresham 4NW             11      9     6.32   -0.04    -0.04
...Embarrass River...
Embarrass 4NW*           7      6     3.55
...Little Wolf River...
Royalton                 5      4     2.06    0.06     0.10
...Waupaca River...
Waupaca 5SE              6      5     2.49    0.00     0.00
...Fox River...
Oshkosh                7.5      7     4.94    0.00     0.00
Appleton                 9    7.5     5.36    0.01     0.05
Green Bay              584    582   579.17   -0.08    -0.17
...Lake Winnebago...
Oshkosh                3.5    3.3     1.71    0.00     0.00
Stockbridge              m     m      1.63    0.00     0.00
Menasha-Fritse Park    5.5      5     1.65    0.00
...Duck Creek...
Howard/Hobart           18     15    11.40   -0.02    -0.02
----------------------------------------------------------
----------------------------------------------------------
...Lake Michgan Rivers
                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Kewaunee River...
Kewaunee                14     12     9.43   -0.08    -0.03
...Manitowoc River...
Manitowoc               10      8     4.94    1.17     0.78
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wisconsin River...
Lake Tomahawk-Rnbow      6      4     2.10    0.01     0.02
Merrill                 11     10     5.04    0.13    -0.04
Rothschild              25     18    13.89    0.07     0.06
Wisconsin Rapids        12     10     3.00
...Spirit River...
Spirit Falls             8      5     1.56   -0.01    -0.02
...Prairie River...
Merrill*      hwy c      7    4.5     2.31    0.22     0.00
...Big Rib River...
Rib Falls               10      7     2.63   -0.04    -0.04
...Eau Claire River...
Kelly-Rothschild         7      6     5.60
...Big Eau Pleine River...
Stratford*            15.5     11     3.24    1.62    -0.07
...Plover River...
Stevens Point          7.5      6     1.24    0.87     0.07
...Ten Mile Creek...
Nekoosa                9.5    7.5     4.66
...Yellow River...
Babcock                 12     10     2.45    0.00     0.01
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season. Most data
in this report is from the U.S. Geological Survey. Other sources
include U.S Army Corps of Engineers, Wisconsin Public Service
and some partners with NWS Marquette.
$$






000
SRUS43 KGRB 280045
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-010045-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
645 PM CST FRI FEB 27 2015

...Menominee-Oconto-Peshtigo basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Iron River...
Caspian-MI             11     10      4.72    0.01     0.01
...Paint River...
Alpha-MI                m      m      4.01    0.01     0.02
...Michigamme River...
Crystal Falls-MI        8      7
...Brule River...
Florence Hwy 41         9      6      5.08   -0.07     0.02
Commonwealth 3N        12     10      6.67   -0.02    -0.09
...Popple River...
Fence     3NW           6      4      2.39    0.03     0.04
...Pine River...
Florence 6S             7      6      3.59    0.24     0.26
...Menominee River...
Florence-4NE            9    8.5      3.89   -0.91    -0.62
Twin Falls dam        20.5  18.5     15.44   -0.21    -0.15
Niagara                13     10      6.66    0.69     0.02
Vulcan-MI              15      9      6.08   -0.04    -0.02
Pembine     11SE       15     12     11.87   -0.12    -0.21
Banat-White Rapids     14     11      7.12   -0.44    -0.02
Koss-MI       1SE      17     15     11.06
McAllister 3E          15     12     10.75   -0.10    -0.04
...Pike River...
Amberg    Hwy 141     6.5    4.5      3.31   -0.02    -0.02
...Oconto River...
Gillett               7.5    5.5      3.42   -0.01    -0.03
Oconto 5SW              9      7      5.16    1.96    -0.03
...Peshtigo River...
Athelstane 10WSW        9    6.5      4.78
Porterfield            12     10      8.67    0.03    -0.01
Peshtigo               10      9      2.54    0.04    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wolf River...
Langlade              11.5    9.5     9.29    0.03     0.01
Shawano 4N              11     10     8.47   -0.08    -0.04
Shiocton              once a day reading in the morning
New London               9      7     2.86    0.00     0.00
...Red River...
Gresham 4NW             11      9     6.32   -0.04    -0.04
...Embarrass River...
Embarrass 4NW*           7      6     3.55
...Little Wolf River...
Royalton                 5      4     2.06    0.06     0.10
...Waupaca River...
Waupaca 5SE              6      5     2.49    0.00     0.00
...Fox River...
Oshkosh                7.5      7     4.94    0.00     0.00
Appleton                 9    7.5     5.36    0.01     0.05
Green Bay              584    582   579.17   -0.08    -0.17
...Lake Winnebago...
Oshkosh                3.5    3.3     1.71    0.00     0.00
Stockbridge              m     m      1.63    0.00     0.00
Menasha-Fritse Park    5.5      5     1.65    0.00
...Duck Creek...
Howard/Hobart           18     15    11.40   -0.02    -0.02
----------------------------------------------------------
----------------------------------------------------------
...Lake Michgan Rivers
                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Kewaunee River...
Kewaunee                14     12     9.43   -0.08    -0.03
...Manitowoc River...
Manitowoc               10      8     4.94    1.17     0.78
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wisconsin River...
Lake Tomahawk-Rnbow      6      4     2.10    0.01     0.02
Merrill                 11     10     5.04    0.13    -0.04
Rothschild              25     18    13.89    0.07     0.06
Wisconsin Rapids        12     10     3.00
...Spirit River...
Spirit Falls             8      5     1.56   -0.01    -0.02
...Prairie River...
Merrill*      hwy c      7    4.5     2.31    0.22     0.00
...Big Rib River...
Rib Falls               10      7     2.63   -0.04    -0.04
...Eau Claire River...
Kelly-Rothschild         7      6     5.60
...Big Eau Pleine River...
Stratford*            15.5     11     3.24    1.62    -0.07
...Plover River...
Stevens Point          7.5      6     1.24    0.87     0.07
...Ten Mile Creek...
Nekoosa                9.5    7.5     4.66
...Yellow River...
Babcock                 12     10     2.45    0.00     0.01
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season. Most data
in this report is from the U.S. Geological Survey. Other sources
include U.S Army Corps of Engineers, Wisconsin Public Service
and some partners with NWS Marquette.
$$






000
SRUS43 KGRB 271430
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-281430-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
830 AM CST FRI FEB 27 2015

...Menominee-Oconto-Peshtigo basins...
                                       This
                      Flood Bankfull   Mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Iron River...
Caspian-mi              11     10      4.71    0.02     0.11
...Paint River...
Alpha-mi                 M      M      4.00    0.01    -0.12
...Michigamme River...
Crystal Falls-MI         8      7
...Brule River...
Florence Hwy 41 USGS     9      6      5.15    0.00     0.04
Commonwealth 3N USGS    12     10      6.69   -0.06    -0.06
...Popple River...
Fence 3NW       USGS     6      4      2.36    0.03     0.04
...Pine River...
Florence 6S     USGS     7      6      3.34   -0.06    -0.06
...Menominee River...
Florence-4NE    USGS     9    8.5      4.80    0.23     0.23
Twin Falls      USGS  18.5   20.5     15.65   -0.17     0.11
Niagara         USGS    13     10      5.97   -0.70     0.01
Vulcan          USGS    16     14      6.12   -0.02    -0.01
Pembine 11SE    USGS    15     12     11.99   -0.04     0.01
Banat           USGS    14     11      7.53    0.10     0.08
Koss,MI         USGS    17     15     10.98   -0.12    -0.01
McAllister 3E   USGS    15     12     10.84   -0.01     0.18
...Pike River...
Amberg          USGS   6.5    4.5      3.33   -0.05    -0.05
...Oconto River...
Gillett         USGS   7.5    5.5      3.43            -0.05
Stiles  Oconto Elect   605    603    601.24    0.29     0.33
Oconto 5SW      USGS     9      7      3.24   -2.07    -2.05
...Peshtigo River...
Athelstane      USGS     9    6.5      4.84   -0.03    -0.03
Porterfield     USGS    12     10      8.63   -0.03    -0.03
Peshtigo        USGS    10      9      2.51    0.04     0.06
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wolf River...

Shawano          NWS     11     10     8.55    0.19     0.07
Shiocton        WWTP     11      9     4.18   -0.02    -0.06
New London     USACE      9      7     2.86   -0.01    -0.04
...Red River...
Gresham 4NW     USGS     11      9     6.36   -0.04     0.05
...Embarrass River...
Embarrass 4NW   USGS      7      6
...Little Wolf River...
Royalton       USACE      5      4     2.00   -0.02    -0.02
...Waupaca River...
Waupaca 5SE    USACE      6      5     2.46   -0.02    -0.01
...Fox River...
Oshkosh         USGS    7.5      7     4.94    0.00     0.00
Appleton        USGS    8.4    7.5     5.35    0.19    -0.02
Green Bay       USGS    584    582   579.25    0.31    -0.80
...Lake Winnebago...
Oshkosh        USACE    3.5    3.3     1.71    0.00    -0.02
Stockbridge    USACE     m     m       1.63    0.00     0.01
Menasha        USACE    5.5      5     1.65    0.03     0.03
...Duck Creek...
Howard/Hobart   USGS     18     15    11.42   -0.01    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Lake Michigan rivers
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Kewaunee River...
Kewaunee        USGS     14     12     9.51    0.01     0.02
...Manitowoc River...
Manitowoc       USGS     10      8     3.77    0.08     0.08
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wisconsin River...
Lac Vieux Desert USGS    82.5   81
Lake Tomahawk    USGS     6      4     2.09    0.00    -0.02
Merrill          USGS    11     10     4.91   -0.42    -0.13
Rothschild       USGS    25     18    13.82   -0.59     0.06
Wisconsin Rapids  CWP    12     10
...Spirit River...
Spirit Falls     USGS     8      5
...Prairie River...
Merrill   Hwy C  USGS     7    4.5     2.10   -0.01    -0.03
...Big Rib River...
Rib Falls        USGS    10      7     2.67    0.00     0.03
...Eau Claire River...
Kelly            USGS     9      7     7.70    5.78     5.83
...Big Eau Pleine River...
Stratford        USGS  15.5     11     1.60   -0.21    -0.44
...Plover River...
Stevens Point    USGS   7.5      6     0.37   -0.36    -0.58
...Ten Mile Creek...
Nekoosa          USGS   9.5    7.5     5.05    0.66     0.64
...Yellow River...
Pittsville       WWTP    13     10
Babcock          USGS    12     10     2.45    0.01    -0.02
$$
----------------------------
     ...Frost depth and snow core sample data...
Updated on this summary during the winter months.
Frost depth measurements are normally taken on Monday
and Thursday mornings.  Snow core samples are taken if
Snow depth is 2 inches or more.
                                      Top of       Snow
                             Frost  Frost layer    Core
                             depth    thawed      Sample
Location            County    (in)     (in)        (in)
Presque Isle        Vilas       M        M           M
Land O Lakes 10w    Vilas       M        M           M
Phelps              Vilas       M        M           M
Boulder Junction 2N Vilas       M        M           M
Arbor Vitae-Jnsn Lk Vilas       M        M           M
Long Lake 3NE       Florence    M        M           M
Aurora 4W           Florence   28        0           M
Florence Utility    Florence   58        0           M
Mole Lake           Forest      M        M           M
Lake Tomahawk 2SE   Oneida      M        M        2.80
Merrill 4W          Lincoln     M        M        2.00
Merrill 8W          Lincoln     M        M           M
Althestane          Marinette  33        0           M
Marinette WPS       Marinette   M        M           M
Townsend 2NE        Oconto      M        M           M
Oconto-1NW Hwy Dept Oconto     32        0           M
Suring-4E Hwy Dept  Oconto     42        M           M
Antigo DNR          Langlade    M        M           M
Wausau-TV-7         Marathon   29        0           M
Colby-5NE           Marathon    M        M           M
Keshena Forestry    Menominee  20        0           M
Marshfield uw       Wood       15        0           M
Plover-south        Portage    31        0        0.20
Stevens Point S     Portage     M        M           M
Almond 5NE          Portage    32        0        1.70
Hancock UW Farm     Waushara    M        M           M
Clintonville WWTP   Waupaca     M        M        0.70
Weyauwega           Waupaca    44        0        0.40
Bowler              Shawano    37        0           M
Appleton-East-DOT   Outagamie  28        0           M
Kimberly            Outagamie   M        M           M
Appleton east       Outagamie  28        0           M
Darboy Appleton 4SE Outagamie  25        0           M
Oshkosh WWTP        Winnebago   M        M           M
Oshkosh north       Winnebago   M        M           M
Oshkosh-4N Hwy Dept Winnebago  25        0           M
Suamico 3SW            Brown   37        0           M
Green Bay NWS          Brown   27        0        0.90
Green Bay-4NW Hwy Dept Brown    M        M           M
Greenleaf Hwy Dept     Brown    M        M           M
Chilton Wwtp        Calumet    19        M           M
Kiel                Manitowoc   M        M
Manitowoc south     Manitowoc   8        0           M
Manitowoc-Rockwood  Manitowoc   8        0           M
Kewaunee-3W hwy Dept Kewaunee   M        M           M
Casco-2W Hwy Dept    Kewaunee  18        0           M
Ephraim-1NE  WWTP        Door   M        M           M
Sister Bay-1S Hwy dept   Door  34        0           M
Sturgeon Bay-1S Hwy Dept Door  31        0           M
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season.  Most data
in this report is from the U.S. Geological Survey.  Other sources
include U.S Army Corps of Engineers and Wisconsin Public Service.
Snowfall and frost depth reported from various observers.
$$






000
SRUS43 KGRB 271430
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-281430-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
830 AM CST FRI FEB 27 2015

...Menominee-Oconto-Peshtigo basins...
                                       This
                      Flood Bankfull   Mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Iron River...
Caspian-mi              11     10      4.71    0.02     0.11
...Paint River...
Alpha-mi                 M      M      4.00    0.01    -0.12
...Michigamme River...
Crystal Falls-MI         8      7
...Brule River...
Florence Hwy 41 USGS     9      6      5.15    0.00     0.04
Commonwealth 3N USGS    12     10      6.69   -0.06    -0.06
...Popple River...
Fence 3NW       USGS     6      4      2.36    0.03     0.04
...Pine River...
Florence 6S     USGS     7      6      3.34   -0.06    -0.06
...Menominee River...
Florence-4NE    USGS     9    8.5      4.80    0.23     0.23
Twin Falls      USGS  18.5   20.5     15.65   -0.17     0.11
Niagara         USGS    13     10      5.97   -0.70     0.01
Vulcan          USGS    16     14      6.12   -0.02    -0.01
Pembine 11SE    USGS    15     12     11.99   -0.04     0.01
Banat           USGS    14     11      7.53    0.10     0.08
Koss,MI         USGS    17     15     10.98   -0.12    -0.01
McAllister 3E   USGS    15     12     10.84   -0.01     0.18
...Pike River...
Amberg          USGS   6.5    4.5      3.33   -0.05    -0.05
...Oconto River...
Gillett         USGS   7.5    5.5      3.43            -0.05
Stiles  Oconto Elect   605    603    601.24    0.29     0.33
Oconto 5SW      USGS     9      7      3.24   -2.07    -2.05
...Peshtigo River...
Athelstane      USGS     9    6.5      4.84   -0.03    -0.03
Porterfield     USGS    12     10      8.63   -0.03    -0.03
Peshtigo        USGS    10      9      2.51    0.04     0.06
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wolf River...

Shawano          NWS     11     10     8.55    0.19     0.07
Shiocton        WWTP     11      9     4.18   -0.02    -0.06
New London     USACE      9      7     2.86   -0.01    -0.04
...Red River...
Gresham 4NW     USGS     11      9     6.36   -0.04     0.05
...Embarrass River...
Embarrass 4NW   USGS      7      6
...Little Wolf River...
Royalton       USACE      5      4     2.00   -0.02    -0.02
...Waupaca River...
Waupaca 5SE    USACE      6      5     2.46   -0.02    -0.01
...Fox River...
Oshkosh         USGS    7.5      7     4.94    0.00     0.00
Appleton        USGS    8.4    7.5     5.35    0.19    -0.02
Green Bay       USGS    584    582   579.25    0.31    -0.80
...Lake Winnebago...
Oshkosh        USACE    3.5    3.3     1.71    0.00    -0.02
Stockbridge    USACE     m     m       1.63    0.00     0.01
Menasha        USACE    5.5      5     1.65    0.03     0.03
...Duck Creek...
Howard/Hobart   USGS     18     15    11.42   -0.01    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Lake Michigan rivers
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Kewaunee River...
Kewaunee        USGS     14     12     9.51    0.01     0.02
...Manitowoc River...
Manitowoc       USGS     10      8     3.77    0.08     0.08
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wisconsin River...
Lac Vieux Desert USGS    82.5   81
Lake Tomahawk    USGS     6      4     2.09    0.00    -0.02
Merrill          USGS    11     10     4.91   -0.42    -0.13
Rothschild       USGS    25     18    13.82   -0.59     0.06
Wisconsin Rapids  CWP    12     10
...Spirit River...
Spirit Falls     USGS     8      5
...Prairie River...
Merrill   Hwy C  USGS     7    4.5     2.10   -0.01    -0.03
...Big Rib River...
Rib Falls        USGS    10      7     2.67    0.00     0.03
...Eau Claire River...
Kelly            USGS     9      7     7.70    5.78     5.83
...Big Eau Pleine River...
Stratford        USGS  15.5     11     1.60   -0.21    -0.44
...Plover River...
Stevens Point    USGS   7.5      6     0.37   -0.36    -0.58
...Ten Mile Creek...
Nekoosa          USGS   9.5    7.5     5.05    0.66     0.64
...Yellow River...
Pittsville       WWTP    13     10
Babcock          USGS    12     10     2.45    0.01    -0.02
$$
----------------------------
     ...Frost depth and snow core sample data...
Updated on this summary during the winter months.
Frost depth measurements are normally taken on Monday
and Thursday mornings.  Snow core samples are taken if
Snow depth is 2 inches or more.
                                      Top of       Snow
                             Frost  Frost layer    Core
                             depth    thawed      Sample
Location            County    (in)     (in)        (in)
Presque Isle        Vilas       M        M           M
Land O Lakes 10w    Vilas       M        M           M
Phelps              Vilas       M        M           M
Boulder Junction 2N Vilas       M        M           M
Arbor Vitae-Jnsn Lk Vilas       M        M           M
Long Lake 3NE       Florence    M        M           M
Aurora 4W           Florence   28        0           M
Florence Utility    Florence   58        0           M
Mole Lake           Forest      M        M           M
Lake Tomahawk 2SE   Oneida      M        M        2.80
Merrill 4W          Lincoln     M        M        2.00
Merrill 8W          Lincoln     M        M           M
Althestane          Marinette  33        0           M
Marinette WPS       Marinette   M        M           M
Townsend 2NE        Oconto      M        M           M
Oconto-1NW Hwy Dept Oconto     32        0           M
Suring-4E Hwy Dept  Oconto     42        M           M
Antigo DNR          Langlade    M        M           M
Wausau-TV-7         Marathon   29        0           M
Colby-5NE           Marathon    M        M           M
Keshena Forestry    Menominee  20        0           M
Marshfield uw       Wood       15        0           M
Plover-south        Portage    31        0        0.20
Stevens Point S     Portage     M        M           M
Almond 5NE          Portage    32        0        1.70
Hancock UW Farm     Waushara    M        M           M
Clintonville WWTP   Waupaca     M        M        0.70
Weyauwega           Waupaca    44        0        0.40
Bowler              Shawano    37        0           M
Appleton-East-DOT   Outagamie  28        0           M
Kimberly            Outagamie   M        M           M
Appleton east       Outagamie  28        0           M
Darboy Appleton 4SE Outagamie  25        0           M
Oshkosh WWTP        Winnebago   M        M           M
Oshkosh north       Winnebago   M        M           M
Oshkosh-4N Hwy Dept Winnebago  25        0           M
Suamico 3SW            Brown   37        0           M
Green Bay NWS          Brown   27        0        0.90
Green Bay-4NW Hwy Dept Brown    M        M           M
Greenleaf Hwy Dept     Brown    M        M           M
Chilton Wwtp        Calumet    19        M           M
Kiel                Manitowoc   M        M
Manitowoc south     Manitowoc   8        0           M
Manitowoc-Rockwood  Manitowoc   8        0           M
Kewaunee-3W hwy Dept Kewaunee   M        M           M
Casco-2W Hwy Dept    Kewaunee  18        0           M
Ephraim-1NE  WWTP        Door   M        M           M
Sister Bay-1S Hwy dept   Door  34        0           M
Sturgeon Bay-1S Hwy Dept Door  31        0           M
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season.  Most data
in this report is from the U.S. Geological Survey.  Other sources
include U.S Army Corps of Engineers and Wisconsin Public Service.
Snowfall and frost depth reported from various observers.
$$





000
SRUS43 KGRB 271430
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-281430-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
830 AM CST FRI FEB 27 2015

...Menominee-Oconto-Peshtigo basins...
                                       This
                      Flood Bankfull   Mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Iron River...
Caspian-mi              11     10      4.71    0.02     0.11
...Paint River...
Alpha-mi                 M      M      4.00    0.01    -0.12
...Michigamme River...
Crystal Falls-MI         8      7
...Brule River...
Florence Hwy 41 USGS     9      6      5.15    0.00     0.04
Commonwealth 3N USGS    12     10      6.69   -0.06    -0.06
...Popple River...
Fence 3NW       USGS     6      4      2.36    0.03     0.04
...Pine River...
Florence 6S     USGS     7      6      3.34   -0.06    -0.06
...Menominee River...
Florence-4NE    USGS     9    8.5      4.80    0.23     0.23
Twin Falls      USGS  18.5   20.5     15.65   -0.17     0.11
Niagara         USGS    13     10      5.97   -0.70     0.01
Vulcan          USGS    16     14      6.12   -0.02    -0.01
Pembine 11SE    USGS    15     12     11.99   -0.04     0.01
Banat           USGS    14     11      7.53    0.10     0.08
Koss,MI         USGS    17     15     10.98   -0.12    -0.01
McAllister 3E   USGS    15     12     10.84   -0.01     0.18
...Pike River...
Amberg          USGS   6.5    4.5      3.33   -0.05    -0.05
...Oconto River...
Gillett         USGS   7.5    5.5      3.43            -0.05
Stiles  Oconto Elect   605    603    601.24    0.29     0.33
Oconto 5SW      USGS     9      7      3.24   -2.07    -2.05
...Peshtigo River...
Athelstane      USGS     9    6.5      4.84   -0.03    -0.03
Porterfield     USGS    12     10      8.63   -0.03    -0.03
Peshtigo        USGS    10      9      2.51    0.04     0.06
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wolf River...

Shawano          NWS     11     10     8.55    0.19     0.07
Shiocton        WWTP     11      9     4.18   -0.02    -0.06
New London     USACE      9      7     2.86   -0.01    -0.04
...Red River...
Gresham 4NW     USGS     11      9     6.36   -0.04     0.05
...Embarrass River...
Embarrass 4NW   USGS      7      6
...Little Wolf River...
Royalton       USACE      5      4     2.00   -0.02    -0.02
...Waupaca River...
Waupaca 5SE    USACE      6      5     2.46   -0.02    -0.01
...Fox River...
Oshkosh         USGS    7.5      7     4.94    0.00     0.00
Appleton        USGS    8.4    7.5     5.35    0.19    -0.02
Green Bay       USGS    584    582   579.25    0.31    -0.80
...Lake Winnebago...
Oshkosh        USACE    3.5    3.3     1.71    0.00    -0.02
Stockbridge    USACE     m     m       1.63    0.00     0.01
Menasha        USACE    5.5      5     1.65    0.03     0.03
...Duck Creek...
Howard/Hobart   USGS     18     15    11.42   -0.01    -0.01
----------------------------------------------------------
----------------------------------------------------------
...Lake Michigan rivers
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Kewaunee River...
Kewaunee        USGS     14     12     9.51    0.01     0.02
...Manitowoc River...
Manitowoc       USGS     10      8     3.77    0.08     0.08
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...
                                       this
                      flood bankfull   mrngs. 24 hr.  48 hr.
...Location...        stage  stage     stage  change  change
                      (ft.)  (ft.)     (ft.)   (ft.)   (ft.)
...Wisconsin River...
Lac Vieux Desert USGS    82.5   81
Lake Tomahawk    USGS     6      4     2.09    0.00    -0.02
Merrill          USGS    11     10     4.91   -0.42    -0.13
Rothschild       USGS    25     18    13.82   -0.59     0.06
Wisconsin Rapids  CWP    12     10
...Spirit River...
Spirit Falls     USGS     8      5
...Prairie River...
Merrill   Hwy C  USGS     7    4.5     2.10   -0.01    -0.03
...Big Rib River...
Rib Falls        USGS    10      7     2.67    0.00     0.03
...Eau Claire River...
Kelly            USGS     9      7     7.70    5.78     5.83
...Big Eau Pleine River...
Stratford        USGS  15.5     11     1.60   -0.21    -0.44
...Plover River...
Stevens Point    USGS   7.5      6     0.37   -0.36    -0.58
...Ten Mile Creek...
Nekoosa          USGS   9.5    7.5     5.05    0.66     0.64
...Yellow River...
Pittsville       WWTP    13     10
Babcock          USGS    12     10     2.45    0.01    -0.02
$$
----------------------------
     ...Frost depth and snow core sample data...
Updated on this summary during the winter months.
Frost depth measurements are normally taken on Monday
and Thursday mornings.  Snow core samples are taken if
Snow depth is 2 inches or more.
                                      Top of       Snow
                             Frost  Frost layer    Core
                             depth    thawed      Sample
Location            County    (in)     (in)        (in)
Presque Isle        Vilas       M        M           M
Land O Lakes 10w    Vilas       M        M           M
Phelps              Vilas       M        M           M
Boulder Junction 2N Vilas       M        M           M
Arbor Vitae-Jnsn Lk Vilas       M        M           M
Long Lake 3NE       Florence    M        M           M
Aurora 4W           Florence   28        0           M
Florence Utility    Florence   58        0           M
Mole Lake           Forest      M        M           M
Lake Tomahawk 2SE   Oneida      M        M        2.80
Merrill 4W          Lincoln     M        M        2.00
Merrill 8W          Lincoln     M        M           M
Althestane          Marinette  33        0           M
Marinette WPS       Marinette   M        M           M
Townsend 2NE        Oconto      M        M           M
Oconto-1NW Hwy Dept Oconto     32        0           M
Suring-4E Hwy Dept  Oconto     42        M           M
Antigo DNR          Langlade    M        M           M
Wausau-TV-7         Marathon   29        0           M
Colby-5NE           Marathon    M        M           M
Keshena Forestry    Menominee  20        0           M
Marshfield uw       Wood       15        0           M
Plover-south        Portage    31        0        0.20
Stevens Point S     Portage     M        M           M
Almond 5NE          Portage    32        0        1.70
Hancock UW Farm     Waushara    M        M           M
Clintonville WWTP   Waupaca     M        M        0.70
Weyauwega           Waupaca    44        0        0.40
Bowler              Shawano    37        0           M
Appleton-East-DOT   Outagamie  28        0           M
Kimberly            Outagamie   M        M           M
Appleton east       Outagamie  28        0           M
Darboy Appleton 4SE Outagamie  25        0           M
Oshkosh WWTP        Winnebago   M        M           M
Oshkosh north       Winnebago   M        M           M
Oshkosh-4N Hwy Dept Winnebago  25        0           M
Suamico 3SW            Brown   37        0           M
Green Bay NWS          Brown   27        0        0.90
Green Bay-4NW Hwy Dept Brown    M        M           M
Greenleaf Hwy Dept     Brown    M        M           M
Chilton Wwtp        Calumet    19        M           M
Kiel                Manitowoc   M        M
Manitowoc south     Manitowoc   8        0           M
Manitowoc-Rockwood  Manitowoc   8        0           M
Kewaunee-3W hwy Dept Kewaunee   M        M           M
Casco-2W Hwy Dept    Kewaunee  18        0           M
Ephraim-1NE  WWTP        Door   M        M           M
Sister Bay-1S Hwy dept   Door  34        0           M
Sturgeon Bay-1S Hwy Dept Door  31        0           M
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season.  Most data
in this report is from the U.S. Geological Survey.  Other sources
include U.S Army Corps of Engineers and Wisconsin Public Service.
Snowfall and frost depth reported from various observers.
$$






000
SRUS43 KGRB 270045
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-280045-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
645 PM CST THU FEB 26 2015

...Menominee-Oconto-Peshtigo basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Iron River...
Caspian-MI             11     10      4.72    0.02    -0.03
...Paint River...
Alpha-MI                m      m      3.99    0.00     0.02
...Michigamme River...
Crystal Falls-MI        8      7
...Brule River...
Florence Hwy 41         9      6      5.06   -0.09    -0.01
Commonwealth 3N        12     10      6.76    0.01     0.01
...Popple River...
Fence     3NW           6      4      2.34    0.01     0.01
...Pine River...
Florence 6S             7      6      3.33   -0.07    -0.06
...Menominee River...
Florence-4NE            9    8.5      4.51   -0.06     0.13
Twin Falls dam        20.5  18.5     15.32   -0.50    -0.24
Niagara                13     10      6.64   -0.03    -0.73
Vulcan-MI              15      9      6.10   -0.04    -0.03
Pembine     11SE       15     12     12.07    0.05     0.00
Banat-White Rapids     14     11      7.15   -0.28    -0.19
Koss-MI       1SE      17     15     11.09
McAllister 3E          15     12     10.78   -0.07     0.04
...Pike River...
Amberg    Hwy 141     6.5    4.5      3.33   -0.05    -0.07
...Oconto River...
Gillett               7.5    5.5      3.46            -0.02
Oconto 5SW              9      7      5.18   -0.08    -0.04
...Peshtigo River...
Athelstane 10WSW        9    6.5      4.82
Porterfield            12     10      8.68    0.02     0.03
Peshtigo               10      9      2.55    0.06     0.02
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wolf River...
Langlade              11.5    9.5     9.31    0.02     0.00
Shawano 4N              11     10     8.47    0.11     0.07
Shiocton              once a day reading in the morning
New London               9      7     2.86   -0.01    -0.02
...Red River...
Gresham 4NW             11      9     6.35   -0.01    -0.03
...Embarrass River...
Embarrass 4NW*           7      6     3.55
...Little Wolf River...
Royalton                 5      4     1.96   -0.06    -0.10
...Waupaca River...
Waupaca 5SE              6      5     2.49   -0.02    -0.02
...Fox River...
Oshkosh                7.5      7     4.94    0.00     0.00
Appleton                 9    7.5     5.32    0.15     0.36
Green Bay              584    582   579.36    0.40    -0.57
...Lake Winnebago...
Oshkosh                3.5    3.3     1.71    0.00     0.00
Stockbridge              m     m      1.64    0.01     0.02
Menasha-Fritse Park    5.5      5     1.64    0.02
...Duck Creek...
Howard/Hobart           18     15    11.42   -0.01    -0.02
----------------------------------------------------------
----------------------------------------------------------
...Lake Michgan Rivers
                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Kewaunee River...
Kewaunee                14     12     9.45   -0.05    -0.01
...Manitowoc River...
Manitowoc               10      8     4.16    0.47    -0.54
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wisconsin River...
Lake Tomahawk-Rnbow      6      4     2.08   -0.01     0.00
Merrill                 11     10     5.07   -0.26     0.06
Rothschild              25     18    13.83   -0.58     0.06
Wisconsin Rapids        12     10     2.90
...Spirit River...
Spirit Falls             8      5     1.58   -0.01    -0.02
...Prairie River...
Merrill*      hwy c      7    4.5     2.30    0.21     0.00
...Big Rib River...
Rib Falls               10      7     2.67    0.00    -0.01
...Eau Claire River...
Kelly-Rothschild         7      6     4.53    2.61     2.62
...Big Eau Pleine River...
Stratford*            15.5     11     3.29    1.48    -0.06
...Plover River...
Stevens Point          7.5      6     1.22    0.49    -0.13
...Ten Mile Creek...
Nekoosa                9.5    7.5     4.64
...Yellow River...
Babcock                 12     10     2.44    0.00     0.00
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season. Most data
in this report is from the U.S. Geological Survey. Other sources
include U.S Army Corps of Engineers, Wisconsin Public Service
and some partners with NWS Marquette.
$$






000
SRUS43 KGRB 270045
RVAGRB
WIC009-015-029-037-041-061-067-069-071-073-075-078-
083-085-097-115-125-135-137-139-141-280045-

HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE GREEN BAY WI
645 PM CST THU FEB 26 2015

...Menominee-Oconto-Peshtigo basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Iron River...
Caspian-MI             11     10      4.72    0.02    -0.03
...Paint River...
Alpha-MI                m      m      3.99    0.00     0.02
...Michigamme River...
Crystal Falls-MI        8      7
...Brule River...
Florence Hwy 41         9      6      5.06   -0.09    -0.01
Commonwealth 3N        12     10      6.76    0.01     0.01
...Popple River...
Fence     3NW           6      4      2.34    0.01     0.01
...Pine River...
Florence 6S             7      6      3.33   -0.07    -0.06
...Menominee River...
Florence-4NE            9    8.5      4.51   -0.06     0.13
Twin Falls dam        20.5  18.5     15.32   -0.50    -0.24
Niagara                13     10      6.64   -0.03    -0.73
Vulcan-MI              15      9      6.10   -0.04    -0.03
Pembine     11SE       15     12     12.07    0.05     0.00
Banat-White Rapids     14     11      7.15   -0.28    -0.19
Koss-MI       1SE      17     15     11.09
McAllister 3E          15     12     10.78   -0.07     0.04
...Pike River...
Amberg    Hwy 141     6.5    4.5      3.33   -0.05    -0.07
...Oconto River...
Gillett               7.5    5.5      3.46            -0.02
Oconto 5SW              9      7      5.18   -0.08    -0.04
...Peshtigo River...
Athelstane 10WSW        9    6.5      4.82
Porterfield            12     10      8.68    0.02     0.03
Peshtigo               10      9      2.55    0.06     0.02
----------------------------------------------------------
----------------------------------------------------------
...Fox-Wolf River basins...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wolf River...
Langlade              11.5    9.5     9.31    0.02     0.00
Shawano 4N              11     10     8.47    0.11     0.07
Shiocton              once a day reading in the morning
New London               9      7     2.86   -0.01    -0.02
...Red River...
Gresham 4NW             11      9     6.35   -0.01    -0.03
...Embarrass River...
Embarrass 4NW*           7      6     3.55
...Little Wolf River...
Royalton                 5      4     1.96   -0.06    -0.10
...Waupaca River...
Waupaca 5SE              6      5     2.49   -0.02    -0.02
...Fox River...
Oshkosh                7.5      7     4.94    0.00     0.00
Appleton                 9    7.5     5.32    0.15     0.36
Green Bay              584    582   579.36    0.40    -0.57
...Lake Winnebago...
Oshkosh                3.5    3.3     1.71    0.00     0.00
Stockbridge              m     m      1.64    0.01     0.02
Menasha-Fritse Park    5.5      5     1.64    0.02
...Duck Creek...
Howard/Hobart           18     15    11.42   -0.01    -0.02
----------------------------------------------------------
----------------------------------------------------------
...Lake Michgan Rivers
                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Kewaunee River...
Kewaunee                14     12     9.45   -0.05    -0.01
...Manitowoc River...
Manitowoc               10      8     4.16    0.47    -0.54
----------------------------------------------------------
----------------------------------------------------------
...Wisconsin River basin...

                      Flood Bankfull Latest  12 hr    24 hr
...Location...        stage  stage   stage  change   change
                      (ft.)  (ft.)   (ft.)   (ft.)    (in.)
...Wisconsin River...
Lake Tomahawk-Rnbow      6      4     2.08   -0.01     0.00
Merrill                 11     10     5.07   -0.26     0.06
Rothschild              25     18    13.83   -0.58     0.06
Wisconsin Rapids        12     10     2.90
...Spirit River...
Spirit Falls             8      5     1.58   -0.01    -0.02
...Prairie River...
Merrill*      hwy c      7    4.5     2.30    0.21     0.00
...Big Rib River...
Rib Falls               10      7     2.67    0.00    -0.01
...Eau Claire River...
Kelly-Rothschild         7      6     4.53    2.61     2.62
...Big Eau Pleine River...
Stratford*            15.5     11     3.29    1.48    -0.06
...Plover River...
Stevens Point          7.5      6     1.22    0.49    -0.13
...Ten Mile Creek...
Nekoosa                9.5    7.5     4.64
...Yellow River...
Babcock                 12     10     2.44    0.00     0.00
This report is automated and partially quality controlled.
Data errors may occur due to equipment malfunction or other
Reasons. Some sites have an automated rain gage and 24 rainfall
data is available by 8 am during the warm season. Most data
in this report is from the U.S. Geological Survey. Other sources
include U.S Army Corps of Engineers, Wisconsin Public Service
and some partners with NWS Marquette.
$$





    US Dept of Commerce
    National Oceanic and Atmospheric Administration
    National Weather Service
    1325 East West Highway
    Silver Spring, MD 20910
    Page Author: NWS Internet Services Team
Disclaimer
Information Quality
Credits
Glossary
Privacy Policy
Freedom of Information Act (FOIA)
About Us
Career Opportunities