U.S. DEPARTMENT OF COMMERCEOctober 20, 1988 W/OSO1
TO: All Holders of Operations Manual
SUBJECT: Transmittal Memorandum for Operations Manual Issuance 88-9
1. Material Transmitted:
WSOM Chapter A-21, "NWS Configuration Management for Operational Systems," 22 pages.
2. Summary:
This chapter has been substantially rewritten to reflect changes in roles and responsibilities in the configuration management of NWS commissioned, operational systems. The responsibilities for configuration management of major system improvements in NWS programs are established by the appropriate program manager. The scope of configuration management defined in this document includes only those NWS-commissioned operational systems so authorized by the NWS Configuration Management Board. The most significant aspects of the chapter are summarized below:
a. All references to "Change Management" and "Change Management Board" have been retitled "Configuration Management" and "Configuration Management Board" respectively, to reflect standard Government and industry naming conventions.
b. Redefines the scope of NWS Configuration Management for all NWS-commissioned operational systems.
c. Redefines the roles and responsibilities for management of the NWS Configuration Management process at the national, regional, and site levels.
3. Effect on Other Instructions:
Cancels WSOM Chapter A-21, transmittal issuance 83-23, dated December 30, 1983.
Elbert W. Friday, Jr.
Assistant Administrator
for Weather Services
NWS CONFIGURATION MANAGEMENT FOR OPERATIONAL SYSTEMS
Table of Contents:
1. Purpose2. Definitions
3. Scope of Configuration Management
4. Configuration Management Events
4.1 Configuration Identification
4.2 Configuration Baseline
4.3 Configuration Documentation
4.4 Change Initiation
4.5 Change Administration
4.6 Change Review
4.7 Change Implementation
4.8 Change Verification
4.9 Configuration Modification
4.10 Configuration Validation5. Authorities, Roles, and Responsibilities
5.1 National Headquarters
5.1.1 Assistant Administrator for Weather Services
5.1.2 NWS Configuration Management Board
5.1.3 Director, Office of Systems Operations
5.1.4 Systems Integration Manager
5.1.5 Systems Configuration Manager
5.1.6 Systems Change Manager
5.1.7 Office Directors
5.1.8 Office Program Focal Point
5.1.9 Special Review Groups
5.1.10 Implementation Focal Point
5.2 Regional Headquarters
5.2.1 Regional Director
5.2.2 NWS Regional Systems Manager
5.3 Field Offices
Exhibit:
A-21-1 NWS Configuration Management Events
Appendices:
A - NWS Configuration Management Board Terms of Reference
1. Purpose. This chapter establishes policy and defines the organizational roles and responsibilities for the Configuration Management (CM) of the National Weather Service's (NWS) commissioned, operational systems that collect, process, or disseminate weather data and service products.
2. Definitions. CM is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of a system, control changes to those characteristics, and record and report the status of change processing and implementation.
A system is defined as the integrated physical and logical elements, including facility, hardware, software, communications, and documentation, that meet or define a set of functional specifications based on established service requirements related to the collection, processing, and/or dissemination of weather data and service products.
A new system becomes operational when it has successfully completed a formal test in a field environment coordinated by or through the Office of Systems Operations (OSO) and has been formally commissioned by the NWS.
Configuration identification is the compilation and formal release of complete technical documentation which defines the original approved configuration (baseline). It also defines and documents approved changes to the individual configuration items. Configuration identification assures that all elements of a system's configuration and its supporting documentation are related to ensure continued integrity and compatibility for the operational life of the system.
A baseline is an approved reference point for control of future changes to the form, fit, or function of a particular system.
Configuration control is the systematic evaluation, coordination, and approval or disapproval of proposed changes to the design and construction of a baseline item whose configuration has been formally approved. Configuration control begins in the initial phase of the operation and continues through the operational life of the system.
Proposed changes (i.e., Requests for Change) are classified as "major" or "minor." Requests for Change which require changes to operational NWS system program schedules, which require significant expenditure of resources, or are controversial in nature, are usually referred to as "major" changes. Requests for Change that do not meet any of the criteria for "major" changes are referred to as "minor" changes.
Configuration accounting is the creation of accurate information on the status of a system or any of its discrete parts which satisfies an end use function and is designated for CM. This reporting activity continues during the operational life of the item, continuously reflecting changes authorized for implementation. Configuration status accounting establishes records that include the location of an element, its identification by part number and sometimes by serial number, and its current modification status. This information is necessary for proper management of a system and to support engineering, logistics, and maintenance operations.
Configuration validation is the process of verification of a system's configuration items as to their documentation, specifications, drawings, and requirements.
3. Scope of Configuration Management. CM shall be applied to those systems, so authorized by the NWS Configuration Management Board (CMB) (see section 5.1.2), that are newly commissioned operational systems and to those existing operational systems that are expected to continue in the modernized NWS. For these systems, the NWS CM discipline shall encompass:
a. All configuration items that comprise the physical or logical elements of any operational NWS field system, including facilities, hardware, software, communications, and documentation:
- Facilities include system floor plans or physical layout, power specifications, grounding specifications,
and air conditioning.- Hardware comprises data input, processing, storage, and output devices; cables; and communication
equipment.- Software comprises the operating system, utility programs, firm ware, algorithms, and data base
management functions.- Communications includes the physical network, the data/products that are routed through the network,
and those directories or schedules that manage the additions and deletions of data products.- Documentation includes system designs, specifications, drawings, technical manuals, test procedures,
directories, and parts lists.
b. All direct interfaces from any commissioned, operational NWS field subsystem to a system already under the NWS CM discipline shall automatically come under NWS CM. Changes to the established configuration items of the subsystem shall follow the CM policies and procedures established for the system it directly interfaces.
c. Operational systems funded and maintained by the NWS regions that are interfaced to a system under the NWS CM discipline shall be subject to NWS CM policies and procedures for their communications interface and those products transmitted over that interface to the host NWS CM system. Any candidate system for NWS CM requiring unique policies and procedures shall require formal approval of the NWS CMB. Prerequisites for approval include a "Terms of Reference" document listing the CM policies and procedural guidelines applicable to that system, a definition of the CM baseline elements, the approval authority for proposed changes to each class of baseline elements, and the establishment of appropriate CM data bases.
4. Configuration Management Events. The CM process requires that approval be given before a change is implemented to a system under CM control. The events that occur during the CM process are presented as Exhibit A-21-1, "NWS Configuration Management Events." The major events in this process are:
a. Configuration Identification -- from the initial definition of design through physical identification of as-built parts, subassemblies, assemblies, and facilities, as well as the assignment of CM identifiers and unique serial numbers.
b. Configuration Baseline -- from configuration identification through the establishment and maintenance of a systematic automated data base of the baselines comprising a system.
c. Configuration Documentation -- from the creation through formal release to routine maintenance of the technical documentation, including specifications, drawings, and parts lists.
d. Change Initiation -- from change concept through coordination to submission of the Request for Change.
e. Change Administration -- from submission of the Request for Change through analysis and cataloging to distribution for review.
f. Change Review -- from distribution of the Request for Change for review through the review decision.
g. Change Implementation -- from decision through planning, procurement, development, test and evaluation, production, and implementation.
h. Change Verification -- from implementation of the change through verification that the change was implemented.
i. Configuration Modification -- from initial baseline configuration through approved change or repair replacement transaction in the automated data base.
j. Configuration Validation -- from initial identification of site-specific configuration through field site validation of existing baseline items, approved modifications, approved deviation or waiver, and repair depot transactions.
The following sections establish the policies for each phase of the CM process.
4.1 Configuration Identification. Configuration items, their components and parts, shall be identified uniquely by part number, configuration item number, and serial number or, in the case of software, by assembled modules, modules, and source elements. Newly commissioned, operational NWS systems must provide acceptance requirements, specifications, engineering drawings and lists, technical manuals, initial site and depot spares, and approved configuration identification records as part of the deliverable items when commissioned. The proper level of identification and serialization shall be determined as an element of the system's acceptance testing.
For those existing operational systems that are approved for the NWS CM discipline, CM baseline components and parts shall be identified, inventoried, documented, and assigned unique identifiers for configuration item baseline control.
4.2 Configuration Baseline. Configuration baselines shall be developed containing each configuration item comprising the physical and logical elements of a commissioned, operational NWS system. Each configuration item shall be tabulated in relation to the item's higher assembly. This structure shall be established in an automated NWS CM relational data base system as the definitive current configuration baseline.
4.3 Configuration Documentation. All documentation, including design requirements, specifications, engineering drawings, software documentation, and parts lists shall be retained in the CM Technical Reference Library and, where appropriate, entered into an automated NWS CM data base. The original physical document (e.g., paper copy, magnetic tape, disk cartridge) and any subsequent modifications shall be maintained in the NWS CM Technical Reference Library.
4.4 Change Initiation. Changes to an operational NWS system shall be governed by the level of approval authority (local, regional, or national) for the requested action as defined in the policies and procedures for the specific system (see NWS Configuration Management Procedures Handbook, Chapter 6, "Systems Controlled by Configuration Management," specific system approval authority matrix). Notification of all approved changes at any level shall be forwarded to the next higher approval authority, as specified. A formal Request for Change shall be submitted whenever the requested action will result in a change (i.e., form, fit, or function) to a baseline element of an operational NWS system that is not under the control of the local or regional authority. The change must be documented on a standard Request for Change form and must include the details necessary for a reviewer to make an informed decision on the change.
Changes initiated to solve emergencies may be implemented as necessary but only in the framework of established standard operating procedures, guidelines, or policy for the specific system. Immediate notification to the proper authority of these emergency changes is required. The proper authority for notification shall be defined by the specific system approval authority matrix. The approval for emergency changes will be valid only during the resolution of the emergency. Chronic problems must be resolved through a Request for Change.
Requests for Change can be initiated within the NWS at field, regional headquarters, and national Headquarters offices. Requests initiated at River Forecast Centers (RFC) shall be reviewed by the hydrologist in charge (HIC); requests initiated by Weather Service Offices (WSO) and Weather Service Forecast Offices (WSFO) shall be reviewed by the area manager (AM) who is the WSFO meteorologist in charge (MIC). These requests shall be transmitted to the regional systems manager (RSM) for proper coordination (see section 5.2.2) with other field, regional headquarters, and national Headquarters offices, as appropriate. The Regional Director, or designee signing for the Regional Director, shall approve all Requests for Change for transmittal to the Systems Integration Manager (SIM) for formal review and decision (see section 5.1.4).
Requests for Change initiated by an NWS Headquarters office, or an NWS Center within an NWS Headquarters office, shall be coordinated by that office's NWS focal point with the office's divisions. The Office Director, or designee signing for the Office Director, shall approve the Request for Change for transmittal to the SIM for formal review and decision.
Requests for Change initiated outside the NWS shall be prepared for submission to the NWS CM process by the receiving NWS office and forwarded along normal organizational channels to the NWS Headquarters for formal review and decision by the appropriate authority level as defined by the specific system approval authority matrix.
4.5 Change Administration. A Request for Change shall be classified as a "major" change or a "minor" change. A Request for Change of a specialized nature (i.e., requiring specific expertise) shall be assigned the responsibility of a special CM review group (see section 5.1.9).
Each Request for Change form shall be cataloged in the automated CM data base. The Request for Change shall be examined to ensure that all information, necessary for the reviewers to understand the change, is included. Additional information shall be solicited from the requester and others and analyzed, as appropriate.
The formal review process shall be determined by the following criteria:
a. Requests for Change that follow preestablished policy (i.e., precedent set by prior Requests for Change) shall be reviewed for technical adherence to the policy only.
b. Requests for Change that are deemed "minor" shall be distributed to special focal areas for review and recommendation.
c. Requests for Change of a specialized nature shall be distributed to the appropriate special CM review group chairman and each member of that group. For example, Requests for Change for data products shall be distributed to the Data Review Group (see appendix B).
d. Requests for Change that are deemed "major" shall be distributed to all NWS Headquarters offices and regions for review and recommendation.
4.6 Change Review. All Requests for Change that are distributed for review shall be assigned a return date for recommendation. The reviewer is expected to provide detailed comments resulting from a thorough review related to his/her area of technical expertise. If a coordinated action cannot be determined from this review, the Request for Change shall be prepared for review by the NWS CMB. Requests for Change requiring the NWS CMB's action shall be presented with background information, a summary of the reviews, and a recommended course of action.
When a Request for Change is not scheduled for CMB action, the NWS CMB shall be informed of the action taken. The information shall be transmitted to the CMB in a report issued biannually. The report shall also catalog the Requests for Change that are in review.
A formal NWS CMB meeting shall be convened for those "major" Requests for Change that cannot be resolved based on the recommendations presented to the CMB. Requests for Change which cannot be resolved by the CMB will be brought to the attention of the Assistant Administrator for Weather Services.
4.7 Change Implementation. Implementation of changes approved by the CMB shall be performed as directed by the CMB. All other changes shall be acted upon by the SIM or by the appropriate offices through agreement with the SIM. The originator of a Request for Change shall be notified when it has been either approved or rejected. Notification of approval or rejection of each Request for Change shall be through memorandum transmitted to the requesting office or regional director. Notification of approval or rejection of "major" changes shall occur by memorandum upon acceptance of the CMB meeting minutes by the CMB members.
Notification of approval or rejection of "minor" changes shall occur by memorandum upon formulation of the decision and coordination with affected offices. Notification of approval or rejection of special CM review group items shall occur by memorandum upon action by the appropriate special CM review group.
The Systems Integration Division (SID) shall coordinate the necessary actions for the implementation of all approved changes. The notification of approval memorandum shall contain the identification of the focal point for implementation of the change actions, an outline of the actions to be taken to implement the change, and the organizational element responsible for the performance of the actions. Data product changes shall be announced to the field in an NWS administrative message (e.g., Change Notice or GENOT) prior to the time of implementation.
4.8 Change Verification. A verification process shall occur to determine that the change has been implemented as defined. Verification of the change action of "major" and "minor" Requests for Change shall be performed by the implementation focal point using existing information systems as the data source whenever possible. The implementation focal point will usually be a SID staff member or RSM in the case of "major" and "minor" changes, and a review group member in the case of special OM review group changes. This verification completion shall be reported to the Systems Change Manager, who is responsible for the maintenance of the Request for Change information system. When the implemented change cannot be verified through existing information systems, the coordinator shall contact the originator of the Request for Change to solicit the verification data.
4.9 Configuration Modification. When the change has been verified, the baseline configuration items shall be changed in the automated data bases to reflect the approved change. The status code of the Request for Change in the CM information system shall indicate the completion date.
A current accounting of all configuration items, their locations, part numbers, serial numbers, and modification status, shall be reported routinely and available to users upon demand.
4.10 Configuration Validation. Several integrated report processes shall be performed routinely to provide a methodical update to CM data from information supplied by National Logistics Supply Center transactions, various Engineering Division automated inventory processes, and approved configuration changes. Periodic validations augment these processes to provide a definitive configuration baseline. These validations shall be initiated by the creation and transmission of configuration baseline validation packages to selected field offices, centers, or NWS Headquarters focal points for verification. These validation packages shall include a status accounting of all approved site-specific configuration changes for review.
5. Authorities, Roles, and Responsibilities. This section describes the authorities, roles, and responsibilities for the CM of operational NWS systems at the national, regional, and local levels.
5.1 National Headquarters. At the national Headquarters level, the major NWS CM functions are executed by the Assistant Administrator for Weather Services; the Director, OSO; the SIM; the Systems Configuration Manager; the Systems Change Manager; the office directors; and the office focal points.
5.1.1 Assistant Administrator for Weather Services. The Assistant Administrator for Weather Services is the authorizing official for NWS CM. The Assistant Administrator shall be the ultimate approval authority for: (1) the establishment of any changes to the CM process within the NWS and (2) changes that have a major impact on service requirements, the NWS organization, NWS budget, or previously approved program schedules and those changes that cannot be resolved by the NWS CMB.
5.1.2 NWS Configuration Management Board. The CMB has been established by the Assistant Administrator for Weather Services to govern the NWS CM program; he has delegated authority to that body to ensure the proper management of the NWS CM process. The Assistant Administrator for Weather Services has redelegated authority to the CMB for the integration of additional systems to the NWS CM process. To provide maximum breadth of responsibility and authority, the CMB comprises the NWS Headquarters office directors and the NWS regional directors and reports to the Assistant Administrator for Weather Services. The Director, OSO (see section 5.1.3), chairs the CMB.
Specific responsibilities of the CMB are:
a. Authorizes the inclusion of an NWS system under the provisions of the NWS CM process.
b. Establishes specialized management mechanisms for handling recurring CM tasks or functions (e.g., administrative management and review groups).
c. Reviews CM activities, according to its discretion, and redirects activities, if appropriate.
d. Allocates resources (staff, funds, and facilities) necessary to accomplish all tasks assigned by the CMB.
e. Defines and clarifies CM roles and responsibilities within the NWS.
f. Reviews and acts upon "major" Requests for Change.
g. Resolves any "minor" Requests for Change that cannot be resolved by the SIM (see section 5.1.4).
h. Recommends options for any changes that significantly affect service requirements, NWS organization, budget, or a previously approved CM change to the Assistant Administrator for Weather Services.
i. Refers decisions on "major" Requests for Change which the CMB cannot resolve to the Assistant Administrator for Weather Services.
j. Ensures proper documentation of CMB decisions on Requests for Change and issues presented for action.
k. Approves transmittal of any Request for Change originating within the respective office or region.
l. Designates the CM focal point or RSM, as appropriate.
m. Designates representatives to serve on formal CM review groups, as appropriate.
The terms of reference governing the activities of the CMB are presented as Appendix A, "NWS Configuration Management Board Terms of Reference." Those terms of reference are supplemented by this chapter.
5.1.3 Director, Office of Systems Operations. The Assistant Administrator for Weather Services has delegated authority for the management of operational NWS systems to the Director, OSO (W/OSO).
Specific responsibilities of the Director, OSO, with respect to CM are:
a. Serves as chairman of the CMB. Informs the Assistant Administrator for Weather Services of any major issues that cannot be resolved by the Board.
b. Approves the issuance and changes to the NWS Configuration Management Procedures Handbook (see section 6).
5.1.4 Systems Integration Manager. The CMB has redelegated authority to the SIM to act as its agent, across organizational lines, for the general management of all Requests for Change to commissioned, operational NWS systems. The SIM is the Chief, SID (W/OSO1).
Specific responsibilities of the SIM with respect to CM are:
a. Manages, coordinates, and tracks the configuration control process.
b. Receives all formal CM Requests for Change.
c. Analyzes and evaluates Requests for Change in terms of potential effects on resources, service requirements, and the NWS organization.
d. Classifies formal Requests for Change as "minor" or "major." (These decisions may be reviewed at the discretion of the CMB.)
e. Approves "minor" Requests for Change. "Minor" Requests for Change do not require CMB approval but must be approved by the SIM before action or implementation is initiated.
f. Recommends action to the CMB for "major" Requests for Change.
5.1.5 Systems Configuration Manager. The SIM has delegated the authority for the operation of the configuration identification, configuration baseline modification, and configuration validation processes to the Systems Configuration Manager. The Systems Configuration Manager is also the Chief, Configuration Management Section (W/OSO113).
Specific responsibilities of the Systems Configuration Manager with respect to CM are:
a. Applies consistent and systematic methods to the identification of facilities, hardware, software, and communications items, and the identification of baselines, as well as documents, drawings, and data lists that support and define precise system baselines.
b. Designs an integrated record system containing configuration identification data.
c. Issues configuration identification numbers for items under a standard controlled process.
d. Receives, itemizes, processes, and maintains configuration item transactions (deliverables, sparing, approved changes, and engineering modifications) in an automated on-line data base.
e. Maintains appropriate data files within the automated data base that record significant data on parts lists, specifications, engineering change proposals, specification control drawings, data lists, and other technical procedures or manuals.
f. Compiles and publishes configuration reports, including baseline reports, to the format and schedule specified by the SID, CMB, National Oceanic and Atmospheric Administration, General Services Administration, or system contractors.
g. Initiates periodic validations of configuration baseline items at system sites to maintain the quality of the baseline data base and the definitive facility design manual of each site.
5.1.6 Systems Change Manager. The SIM has delegated the authority for the operation of the change control process to the Systems Change Manager. The Systems Change Manager is also the Chief, Change Management Section (W/OSO112).
Specific responsibilities of the Systems Change Manager with respect to configuration management are:
a. Receives Requests for Change from the SIM and verifies that they contain adequate information.
b. Requests additional detail from the originator if the information provided is incomplete.
c. Analyzes the Request for Change to determine its effect on hardware, software, communications, procedures, the significance of the resources required, the areas of technical expertise, and interactions with other systems.
d. Coordinates the design of alternative approaches to satisfy requirements stated in the Request for Change. Provides rationale and decision parameters to enable evaluators to select the best approach. Coordinates the cost information for each of the alternatives.
e. Specifies test plans and procedures to evaluate the selected approach. Coordinates the performance of the test with the technical experts and the field, or central test sites and other systems, the collection of test data, and the preparation of the test report.
f. Distributes Requests for Change to regions and offices for review and recommendation.
g. Performs secretariat functions for the CMB, including scheduling meetings, preparing the agenda and supporting information, assisting the chairman in the conduct of meetings, and preparing and distributing meeting minutes.
h. Prepares memoranda of notification of approval or rejection of Requests for Change, prepares implementation status information, maintains the Request for Change information system, and verifies completed changes.
i. Provides limited administrative support to special CM review groups.
5.1.7 Office Directors. The Directors of the offices of Meteorology (OM), Hydrology (OH), Systems Development (OSD), and Systems Operations (OSO), Management and Budget (MB), the Transition Program Office (TPO), and the National Meteorological Center (NMC) are voting members of the NWS CMB. Office directors have the responsibility for approval of each Request for Change originating within their office and for transmittal of approved Requests for Change to the SIM.
5.1.8 Office Program Focal Point. Program focal points for OM, OH, OSD, OSO; MB, TPO, and NMC shall be designated by each office's director. Focal points shall serve as the working level contact point for their office for all Requests for Change concerning operational systems under CM. All Requests for Change originated by an office shall be reviewed and coordinated at the office level by the focal point. All coordinated Requests for Change shall be submitted by the focal point to the office's director for approval.
The focal point shall be responsible for the coordination and tracking of Requests for Change received from the Systems Change Manager for review. The focal point shall be responsible for submitting the coordinated recommendation of the office to the Systems Change Manager for each Request for Change. The focal point shall assist in determining national applicability of a Request for Change and shall coordinate this applicability with the regions. The focal point is, therefore, a key element in the interface between national Headquarters and the regions and is vital to the successful performance of the CM process.
5.1.9 Special Review Groups. Special CM review groups may be established by the CMB to provide an orderly, logical, and expeditious review and processing of Requests for Change where specific technical expertise is required. These groups shall be comprised of representatives who provide maximum breadth of responsibility and depth of technical expertise and shall be directed by a group chairman.
Each of these groups receives its administrative direction from the SIM and receives the Requests for Change from the Systems Change Manager only.
The terms of reference governing the activities of these groups shall be approved by the CMB and provided as appendices to this document. Appendix B, for example, is the "Data Review Group Terms of Reference."
5.1.10 Implementation Focal Point. The implementation focal point designated in the Request for Change approval memorandum shall carry out the action(s) assigned and report the completion of the change to the Systems Change Manager.
5.2 Regional Headquarters. At the regional headquarters level, the major NWS CM roles shall be assumed by the regional director and the NWS RSM (see section 5.2.2). The NWS RSM is also the (regional) Chief, Systems Operations Division or designee, acting and signing for the Chief, Systems Operations Division.
5.2.1 Regional Director. The regional directors shall be voting members of the NWS CMB. In the absence of the regional director, the deputy regional director may serve as the CMB voting member. Regional directors or designees signing for the director, shall be responsible for the approval of each Request for Change originating in their region. Approved Requests for Change shall be transmitted to the SIM.
5.2.2 NWS Regional Systems Manager. The RSM is delegated regional responsibility and authority for system operations and support activities. The RSM serves as the regional focal point for Requests for Change. All Requests for Change originated by an NWS field office shall be reviewed and coordinated by the RSM with other field offices and regional headquarters offices, as appropriate. Requests for Change involving RFC-unique software, hardware, or data products shall be reviewed by the regional hydrologist and coordinated at the regional level by the RSM of the region. All coordinated Requests for Change shall be submitted by the RSM to the regional director for approval.
The RSM shall be responsible for the coordination and tracking of Requests for Change received from the Systems Change Manager for regional review. The RSM shall be responsible for submitting the coordinated recommendation of the region for each Request for Change to the Systems Change Manager. The RSM is a key element in the interface between national Headquarters and the regions and is vital to the successful performance of the CM process. The RSM shall be responsible for regional adherence to CM policies and procedures.
The RSM shall be responsible for the timely review and return to the Systems Configuration Manager of completed validation packages received from the AM.
Other responsibilities of the RSM are enumerated in Chapter A-20.
5.3 Field Offices. The field office HIC or AM is responsible for the initial review and transmittal of all Requests for Change to the RSM. The HIC or AM is responsible for the field office's adherence to CM policy and procedures.
Periodic configuration baseline validation packages issued by the Systems Configuration Manager shall be given a timely response. The details of these packages shall be thoroughly coordinated by the HIC or AM to ensure that the validation reflects an accurate up-to-date accounting of the configuration baseline. The HIC or AM shall return the validation package, with annotated corrections, to the RSM for review and forwarding to the Systems Configuration Manager.
6. Configuration Management Procedures Handbook. NWS CM for operational systems procedures for, and a description of, each authorized system's CM baseline elements shall be included in a National Weather Service Office of Systems Operations Configuration Management for Operational Systems Procedures Handbook. The handbook shall specifically include standard CM procedures applicable to all operational systems; document the CM subsystems (i.e., data base management system, forms, specialized procedures, and associated activities) required in the daily administration of the CM process; provide a broad description of the functions, configuration, and location of each component system; and provide a matrix of the baseline elements and depiction of the approval authority for changes to each class of baseline elements.
The approval and issuance of changes to this handbook remain the responsibility of the Director, OSO.
NWS CONFIGURATION MANAGEMENT BOARD
TERMS OF REFERENCE
Revised November 25, 1987
A. Purpose
The purpose of the National Weather Service (NWS) Configuration Management Board (CMB) is to organize and manage the development and operation of a configuration management program for the NWS.
B. Composition
The members of the CMB are the Directors of the NWS Office of Meteorology, Office of Hydrology, Office of Systems Development, Office of Systems Operations, National Meteorological Center, Transition Program Office, Management and Budget Office, and the Directors of all NWS regions. The Chairman is the Director, Office of Systems Operations.
C. Functions
The functions of the CMB encompass those necessary to accomplish its purpose, including explicitly:
1. Identifying all major tasks that are essential to effective management of NWS changes and clarifying the responsibility and authority within the NWS for these tasks.
2. Establishing specialized management mechanisms necessary to accomplish recurring tasks or functions, including NWS configuration management.
3. Serving as the governing body for NWS configuration control.
4. Allocating the resources (staff, funds, and facilities) necessary to accomplish all tasks assigned by the CMB or, if required resources are unavailable, requesting and justifying additional resources.
5. Documenting and reporting all major decisions and their rationale.
6. Recommending changes that have a major effect on service requirements, the NWS organization, NWS budget, or previously approved NWS schedule to the Assistant Administrator for Weather Services.
7. Referring any major issues that cannot be resolved by the CMB to the Assistant Administrator for Weather Services.
D. Operating Rules and Procedures
The CMB will operate under the following rules and procedures:
1. Members are expected to participate personally and normally will not designate an alternate to represent them at meetings. If this should be necessary, the alternate will be delegated full authority.
2. The CMB will operate on the basis of consensus; any member can insist on the resolution of an issue by the Assistant Administrator for Weather Services. The chairman will obtain the resolution.
3. Meetings of the CMB will be announced at least 2 weeks in advance, longer if possible, and an agenda and brief summary of major issues to be decided or discussed will be provided at that time.
4. The chairman, in consultation with members of the CMB, will invite other persons to participate in each CMB meeting as is necessary to facilitate the work planned for that session.
5. The CMB will identify any continuing staff roles needed to support its work and will designate appropriate persons from within their offices to carry out these roles.
6. Written summaries of major decisions will be submitted to members for approval before further distribution, normally within 1 week after the meeting unless the CMB allocates a longer period to allow time for required staff work. Decisions will go into effect, with necessary corrections or clarifications, 1 week after such submissions for final approval.
DATA REVIEW GROUP
TERMS OF REFERENCE
Revised November 25, 1987
A. Purpose
The purpose of the Data Review Group (DRG) is to provide for an orderly, logical, and expeditious review and processing of Requests for Change to data products on communication systems under NWS Configuration Management.
B. Authority
The National Weather Service (NWS) Configuration Management Board (CMB) has authorized the establishment of the DRG under the administrative control of the Systems Integration Manager (SIM), who is the Chief, Systems Integration Division, Office of Systems Operations. The DRG is authorized to approve or reject Requests for Change affecting data products which have been referred to the group by the SIM. The DRG will return those requests that require a change in NWS policy or new budgetary support to the SIM for referral to the CMB.
The determination of the scientific merit of new products (those in development or having just completed development and checkout) remains with the Committee on Analysis and Forecast Technique Implementation (CAFTI). Requests for Change for new products are referred to the DRG after CAFTI recommendations are approved by the Director, Office of Meteorology (OM), and/or the Director, Office of Hydrology (OH).
The validation of requirements for product changes remains the authority of the OM and/or OH. Requests that involve new or changing requirements are referred to the DRG after the validation of requirements is reviewed by the Meteorological Requirements Review Group and approved by the Director, OM, and/or the Director, OH.
The distribution of data products over the Family of Services (FOS) network remains the authority of the FOS Internal Review Committee (IRC). The OM and the Office of Systems Operations' Telecommunications and Dissemination Branch represent the interests of the FOS IRC on the DRG.
C. Composition
The DRG will be composed of at least one member from the OM, OH, National Meteorological Center, Office of Systems Development, and Office of Systems Operations, selected by those organizational elements. The group will not exceed 10 members. The office of chairman will be rotated through each represented office on an annual basis. The term of the chairman will begin at the start of each fiscal year. Any office may pass its turn to provide a chairman.
D. Functions
The functions of the DRG are those necessary for effective and efficient management of data products. These functions include, but are not limited to, the following:
1. Review requested changes to determine the feasibility of their implementation.
2. Provide thorough coordination with the members' offices before and after decisions by the group, each member being responsible for such coordination and prepared to brief the group, as necessary.
3. Return requests to originators and request additional information and/or supporting rationale whenever necessary.
4. Approve or reject requests that fall within the purview of the group.
5. Inform the SIM through memorandum of decisions taken by the group together with the accompanying rationale for each.
6. Inform the SIM through memorandum of tasks to be performed as a result of decisions taken by the group.
7. Return requests upon which the group cannot agree and requests which are determined to severely impact the system to the SIM for consideration by the CMB.
E. Operating Rules and Procedures
The DRG will operate under the following rules and procedures:
1. Members are expected to participate personally and normally will not designate an alternate to represent them at meetings. If an alternate is necessary, the alternate will be delegated full authority. If a member cannot attend a meeting or arrange for an alternate, the representative may give the chairman an instructed proxy, and should provide a summary to the DRG Chairman on the status of items assigned to the representative.
2. A quorum will consist of 50 percent of the membership of the group representing at least three of the offices. Proxies to be voted by the chairman will not count in establishing a quorum.
3. The group will operate on the basis of majority rule but will strive for unanimity.
4. The schedule for regular meetings of the group will depend on their work load, timeliness, and other considerations and will be at the discretion of the chairman. An agenda and brief summary of major issues to be decided or discussed will be provided at least 7 working days in advance.
5. The chairman, in consultation with members of the group, will invite other persons to attend any group meeting as deemed useful to the work of the group.
6. All Requests for Change to data products are to be submitted to the SIM. Upon receipt at the SIM office, they will be logged and distributed to the DRG members for review.
7. Written summaries of major decisions will be submitted to members for approval before becoming final, as part of the meeting minutes. These summaries will be issued within 1 week after the meeting unless a longer time is necessary for required staff work. Decisions will become effective immediately following final approval.
8. Requests for Change which correct simple errors may be approved by chairman between meetings and documented at the next meeting.
WSOM Issuance
89-9-10-20-88